Consultancy Services for Survey, Planning, Design & Supervision of Line Construction and Renovation Works of Power Distribution System Development Project,...
Description
Consultancy Services for Survey, Planning, Design & Supervision of Line Construction and Renovation Works of Power Distribution System Development Project, Mymensingh Zone, BPDB, Mymensingh [DPP Package No.: SD-1 (Lot-2)]
In order to improve the power distribution system, the existing precarious network will be renovated and further expansion of the network was carried out along with augmentation of sub-stations. The main object of the project is to improve the reliability of power supply, reduce electrical losses & provide electricity to consumers.
Services
- Route selection and preparation of staking sheet of lines; - Identification and recording of HV System, MV System, LV System and Service Connection; - Load reading & survey and load forecast; - Detail survey, planning and design of 33 kV incoming & outgoing feeders for 33/11 kV sub-stations, selection of equipment and completion of maps, SLD & stacking sheet in relation to SLD considering the load and fault level of 2030; - Detail survey, planning and design of 11 kV, 0.415 kV & service connection lines, selection of equipment and completion of maps, SLD & stacking sheet in relation to SLD considering the load and fault level of 2030; - Detail survey, planning and design of 11/0.415 kV Pole Mounted Sub-stations; - Voltage drops & technical loss calculation and sectionalizing studies on 33 kV, 11 kV & 0.4 kV system considering the load and fault level of 2030; - Planning and detailed network design with related software (CYME or equivalent); - Preparation of bill of quantities and tender documents for distribution lines. - Preparation of engineering report and As built drawings; - Store inventories; and - Verifying of contractor's bill according to the progress of work.