DDC offers wide-ranging technical, commercial and economic expertise in the telecommunication and power transmission and distribution sector. Our decades of proven experience in energy market means that we are one of the energy sector consultant having widespread footprint all over the country with profound reputation, addressing all of today’s issues ranging from procurement of energy right up to its efficient utilization. We have accumulated diverse expertise from plenty of technical planning and engineering projects. We also develop solutions for power transmission projects and electrical facilities.

 

Our specialists have extensive knowledge and experience in designing electrical substations and power transmission lines as well as construction management during the installation of overhead transmission lines and underground power cables. We have extensive experience in the design of LV/MV electrical power distribution for electrical utilities and industry. We extend our services in the system analysis, feasibility studies, planning, design, procurement assistance, contract negotiations, supervision and commissioning for electricity transmission and distribution projects. We provide consultancy services for oil and gas sector as well. We also do the maintenance consultation.

List of Similar Assignments

The following table summarizes specific experience of the consultant relevant to the assignment

Sl. No.

Name of Project

Client

Duration

1.              

Consultancy Services for the Preparation for the Proposal of Mirershorai Economic Zone

Mirsorai Infrastructure Development Consortium (MIDCO)

Executing Agency: Bangladesh Economic Zones Authority (BEZA)

2015~2016

2.              

Detailed Design and Engineering Work (DDEW) for Abdul Monem Economic Zone (AMEZ)

Abdul Monem Economic Zone Limited

2016

3.              

Secondary Towns Integrated Urban Development Project in Laos PDR: TA NO.: 2396-LAO

Ministry of Communication, Transport, Posts and Construction, Laos PDR

1996

4.              

Preparation of Detailed Area Plan (DAP) for Chittagong Metropolitan Master Plan (CMMP)

Chittagong Development Authority (CDA)

2005~2008

5.              

Preparation of Structure Plan, Master Plan and Detailed Area Development Plan for Rajshahi Metropolitan City

Rajshahi Development Authority (RDA)

2001~2004

6.              

Consultancy Services for Preparation of Detailed Area Plan (2016-2035) for DMDP Area (Lot 2: Part-B)

Rajdhani Unnayan Kartripakkha (RAJUK)

2015~2017

7.              

Preparation of Detailed Area Plan (DAP) for Dhaka-Metropolitan Development Planning (DMDP) Area, Group-A

Rajdhani Unnayan Kartripakkha (RAJUK)

2004~2010

8.              

Preparation of Detailed Area Plan (DAP) for Dhaka-Metropolitan Development Planning (DMDP) Area, Group-C

Rajdhani Unnayan Kartripakkha (RAJUK)

2004~2010

9.              

Consulting Services for Preparation of Detailed Area Development Plan for Khulna Master Plan (2001) Area

Khulna Development Authority (KDA)

2010~
On-going

10.           

Consultancy Services for Preparation of Action Area Plan for Narayangonj City Corporation under Preparation of Action Area Plan for Narayangonj and Gazipur City Corporation

Local Government Engineering Department

2015~2016

11.           

Master Plan Preparation for Consultancy Services: Contract Package No. 03, Selection 121801 under Third Urban Governance Infrastructure Improvement (Sector) Project (UGIIP-III) – ADB Loan No. 3142 BAN

Local Government Engineering Department

2016~2017

12.           

Master Plan Preparation for Consultancy Services: Contract Package No. 02, Selection 121799 under Third Urban Governance Infrastructure Improvement (Sector) Project (UGIIP-III) – ADB Loan No. 3142 BAN

Local Government Engineering Department

2016~2017

13.           

Consulting Services for Preparation of Master Plan for Pourashavas under Upazila Towns Infrastructure Development Project – Package No. 12

Local Government Engineering Department

2008~2015

14.           

Consulting Services for Preparation of Master Plan for Pourashavas under Upazila Towns Infrastructure Development Project – Package No. 10

Local Government Engineering Department

2008~2015

15.           

Consulting Services for Preparation of Master Plan for Pourashavas under Upazila Towns Infrastructure Development Project – Package No. 01

Local Government Engineering Department

2008~2015

16.           

Consultancy Services for Preparation of Master Plan for Pourashavas under District Towns Infrastructure Development Project – Package No.: DTIDP/2007-2008/S01

Local Government Engineering Department

2008~2014

17.           

Special Assistance for Project Implementation (SAPI): Consulting Services Assignment for Araihazar Economic Zone under Foreign Direct Investment Promotion Project (FDIPP)

Japan Development Institute Ltd. (JDI)

2017~2018

18.           

Consulting Services for Preparation of Detailed Master Plan, Drawings, Design, Soil Test & Priced Bills of Quantities, Specifications etc. for 14-storied with 3 Basement Sena Paribar Kalyan Samity (SPKS) Building “Sadhinata Tower” at Dhaka Cantonment, Dhaka

Sena Paribar Kalyan Samity (SPKS)

2007~2015

19.           

18-storied Corporate Head Office Building of Delta Life Insurance Company Limited at Gulshan, Dhaka

Delta Life Insurance Company Limited

1998~2000

2005~2012

20.           

Architectural and Engineering Consulting Services for Construction of Multi-storied (14-storied) Office Building Complex of the Dhaka Stock Exchange Limited at Nikunja, Dhaka

Dhaka Stock Exchange Ltd.

2006~2007
2011~2015

21.           

Multistoried (12-storied) Academic Building of Bangladesh University of Engineering and Technology (BUET) at West Palashi, Dhaka

Bangladesh University of Engineering and Technology (BUET)

2001~2009

22.           

24-storied Janata Bank Building at Motijheel C/A, Dhaka

Janata Bank

1979~1988

23.           

24-storied Jiban Bima Corporation Tower Block at Motijheel C/A, Dhaka

Jiban Bima Corporation

1981~1987

24.           

Construction of 20-storied National Sports Council Tower (NSC Tower)

National Sports Council

2004~2006

25.           

20-storied Bastra Bhaban Building at Kawran Bazar, Dhaka

Bangladesh Textile Mills Corporation

1979~1991

26.           

Construction of 15-storied Office-cum-Commercial Building for The Institution of Engineers, Bangladesh

The Institution of Engineers, Bangladesh (IEB)

2002~2007

27.           

Consultancy Services for Construction of 3 Basement + 24-storied AUB Building Complex at Plot No. E-18, Agargaon, Dhaka

Association of Universities of Bangladesh

2015~2019

28.           

Consultancy Services for Detailed Structural, Electro-Mechanical and Plumbing Design, Preparation of BOQ & Tender Document including Supervision for Construction of Multi-storied (32-storied) Green Building at RAJUK’s Mohakhali Compound, Dhaka

Rajdhani Unnyan Kartripakkha (RAJUK)

2015~2022

29.           

Design and Construction Supervision of Remodeling and Refurbishment of (2 Nos. 20-storied) Zonal and Head Office Buildings  of CWASA at Agrabad and Dampara

Chittagong WASA

2014~2017

30.           

Design and Supervision of Construction of Buildings (12 nos. 15-storied) and Relevant Resettlement Facilities of Dhaka Elevated Expressway (DEE) PPP Project

Bangladesh Bridge Authority (BBA)

2015~2018

31.           

Consultancy Services for Design and Supervision of RHD Headquarters Complex (13-storied)

Roads and Highways Department

2013~2018

32.           

Consultancy Services for Conducting Feasibility Study, Surveying, Physical Planning, Modelling, Detailed Design, Preparation of Bid Documents & Construction Supervision etc. for the Construction of Flyover at Kuril Intersection

Rajdhani Unnayan Kartripakkha (RAJUK)

2007~2014

33.           

Construction of Flyover at Muradpur, 2 No. Gate & GEC Junction, Chittagong

Chittagong Development Authority

2011~2017

34.           

Construction of Over Bridge at Dewanhat Junction, Chittagong under Widening and Improvement of Dhaka Trunk Road Project

Chittagong Development Authority

2012~2014

35.           

Feasibility Study of Dhaka Elevated Expressway

Italian-Thai Development Public Company Ltd.

2010

36.           

Assistance to the Jatrabari-Gulistan Flyover Project under BOOT by Private Investment: Consultancy Services for Design Review / Finalization

Dhaka City Corporation (DCC)

2006~2007

37.           

Supervision, Monitoring and Management of Jatrabari-Gulistan Flyover

Dhaka South City Corporation (DSCC)

2011~2014

38.           

Consultancy Services for SASEC Road Connectivity Project (P40540-BAN/Loan 2949-BAN) [ADB 2016 Best Project Team Award]

Roads and Highways Department

2014~2018

39.           

Road Network Improvement and Maintenance Project-1: Consultancy Services for Preparation of Detailed Design and Construction Supervision of Civil Works (ADB Loan No. 1920-BAN (SF))

Roads and Highways Department

2005~2011

40.           

Telecommunication Network Development Project (TNDP) of BTCL under JICA ODA Loan Agreement No. BD-P53

Bangladesh Telecommunications Company Limited (BTCL)

2010~2016

41.           

Engineering Services for Hasnabad-Aminbazar-Tongi 230kV Transmission Line (Lot A: Civil Works and Lot-B: Electrical Works)

Power Grid Company of Bangladesh Ltd. (PGCB)

2002~2005

42.           

60 MW Sikalbaha Power Station Rehabilitation

Bangladesh Power Development Board

1998~2000

Assignment name:

 

CONSULTANCY SERVICES FOR THE PREPARATION FOR THE PROPOSAL OF MIRERSHORAI ECONOMIC ZONE

 

Funding agency: Mirsorai Infrastructure Development Consortium (MIDCO)

 

Approx. value of the contract (in current US$):

 

US$ 62,325

Country: Bangladesh

Location within country: Mirershorai, Chittagong

 

Duration of assignment (months): 1.63

Name of client:

 

Mirsorai Infrastructure Development Consortium (MIDCO)

 

Executing Agency: Bangladesh Economic Zones Authority (BEZA)

 

Total no. of person-months of the assignment: 7.7

Address:

 

Unique Oval, 45 Kamal Ataturk Avenue, Banani, Dhaka-1213

 

Approx. value of the services provided by the firm under the contract (in current US$):

 

US$ 26,325                  

 

Start date (month/year): 03 December, 2015

Completion date (month/year): 20 January, 2016

No. of professional person-months provided by the joint venture partners or the sub-consultants:

 

03 persons = 1.1 months

 

Name of joint venture partner or sub-consultants, if any:

 

Japan Development Institute, Japan (Lead Partner)

Name of senior full time employees of the firm involved and functions performed:

 

Document Coordinator: Hasan Tarique Chowdhury, Technical Coordinator: Md. Akhtaruzzaman, Road Engineer: Mahbubur Rahman, PEng., Environmental and Soul Engineer: AHM Golam Hyder, Electrical Engineer: Subodh Chandra Biswas, Cost Estimator: Md. Khairul Alam, Architect: Muhammad Mahbubur Rahman, CAD Operator-1.

 

Narrative description of project:

 

Mirsorai Infrastructure Development Consortium (MIDCO) desired to participate in the tender bid for the development of Mirsorai Economic Zone tender floated by Bangladesh Economic Zones Authority (BEZA) on “Design, Built, Finance, Own, Operate and Transfer (DBFOOT)” basis and needed expert services in the preparation, submission and awarding of the tender bid.

 

Description of actual services provided in the assignment:

 

–   Preliminary design, plan and data collection, summarizing, structuring and preparing the tender documents, technical and financial models as part of the bid documents as per the requirement of Request for Proposal (RfP) sought by Bangladesh Economic Zones Authority (BEZA).

 

Assignment name:

 

DETAILED DESIGN AND ENGINEERING WORK (DDEW) FOR ABDUL MONEM ECONOMIC ZONE (AMEZ)

 

Funding agency: Abdul Monem Economic Zone Limited

 

Approx. value of the contract (in current US$):

 

 US$ 254,150               

Country: Bangladesh

Location within country: Gazaria, Munshigonj (37 km from Dhaka Center, located on the Dhaka-Chittagong Highway)

 

Duration of assignment (months): 03

Name of client:

 

Abdul Monem Economic Zone Limited

 

Total no. of person-months of the assignment:

 

24.9

Address:

 

Monem Business District, 111 Bir Uttam C.R. Dutta Road (Sonargaon Road), Dhaka-1205

Tel: +88-2-9632011-13, 9675955

Fax: +88-2-9632316

Email: info@amezl.com, asmhbs@gmail.com

 

Approx. value of the services provided by the firm under the contract (in current US$):

 

US$ 114,063                

Start date (month/year): March, 2016

Completion date (month/year): May, 2016

No. of professional person-months provided by the joint venture partners or the sub-consultants:

 

4 persons – 4.9 mm

 

Name of joint venture partner or sub-consultants, if any:

 

Japan Development Institute, Japan (Lead Partner)

Name of senior full time employees of the firm involved and functions performed:

 

Procurement Specialist / Documentation Engineer: Ashik Imam Khan, Sr. Structural Engineer / Geotechnical Engineer: Mohammad Shams Ul Haque, Structural Engineer: Souptik Barman Tirtha, Pavement Engineer: Mezbah-Ul Alam Al Azad, Sr. Electrical Engineer: Subodh Chandra Biswas, Electrical Engineer: Baddhan Kumar Biswas, Sr. Mechanical Engineer / Communication Expert: Md. Abul Hossain, Drainage Engineer / Water Supply Engineer: Md. Shamsul Alam Siddiqui, Embankment Engineer: Md. Khairul Alam, Quantity Surveyor: Sk. Ashik Mahmud, CAD Operator(s): Md. Abdus Salam / Md. Towhid Khan / Md. Faruk Ahmed

 

Narrative description of project:

 

Abdul Monem Economic Zone (AMEZ) of the pioneer Economic Zone (EZ) projects in Bangladesh. It is created “10 Million Job Creation Plan” for young people and support to Government for economic prospect under BEZA. AMEZ is the first private EZ project in greater Dhaka which will contribute to the National Goal of becoming a middle income country by 2025. AMEZ will followed a market driven approach to be a commercially successful project able to attract high quality foreign and local investors. AMEZ will providing special area with world class facility where entrepreneurs/investors could find a congenial investment climate and ensuring cost effective production facilities for diversified industries with modular factory structures. AMEZ projects to be a new business for the Monem Group as a show case to other private companies. The gross area of the project 314 acres and lease able area 218 acres.

·         Scope of work for detail design are as follows:

·    Source of portable water and distribution system, Water treatment plant, Waste water pipe network, Waste water treatment plant, Drainage system, Entrance road, Road network, Retaining wall and slope protection, Footpath, Power distribution network, Telecommunication and internet work, Power plant, Landscape design, Jetty, Master plan, Water front design, Fire fighting system, Custom bounded area, and Cost schedule.

The project contains: (1) Master Plan and Landscope design for 350 acre area: 80 nos of Industrial Plot. Having a custom bonded area (2) River side Retaining wall: 2.2 km (wall with Geotextile) (3) Boundary wall: 3.75 km (4) Source of Potable water and distribution system (5) Water Treatment Plant: Capacity: 35,000 m3/day (6) Waste water pipe network: 07 km. (7) Waste Water Treatment Plant: Capacity: 20,000 m3/day (8) Drainage System: 07 km (9) Entrance Road: 01 km having a Under pass two vent tunnel. (10) Road Network Design (Alignment and Pavement): 07 km with footpath on the both side (11) Power Distribution Network: 11KV:07km; 220V:07km; Substation: 02 nos (12) Telecommunication and internet Network:  07 km. (13) Power Plant: 70MW (14) Fire fighting system for Economic zone: Road Side Fire Hydrant; retention pond for fire fighting. (15) Jetty: Cargo type on the bank of branch river of Meghna Gomoti.

Description of actual services provided in the assignment:

 

–   Check the preliminary conceptual design of JDI;

–   Design of underground reservoir, evaluated water tank, deep well and collection & distribution networks, waste water and drainage network system;

–   Conceptual design (environmental and preliminary design) including intake, transmission, plant & distribution system, turnkey detail etc.;

–   Preparation of detail design on mild pump, pump house for discharging and outlet of excessive rain water from catchment area and gray water from industrial use (sluice gate and slipway);

–   Review and modify the AMEZ road network and pavement designed in the master plan;

–   Detail design of boundary wall, retaining wall and slope protection etc. Study of existing boundary wall;

–   Footpath considering gas pile/all utilities network designed;

–   Design of power distribution network considering the source of internal and external supply;

–   Location of substation and electrical poles design reviewed;

–   Detail telecommunication and the internet network design as per client’s requirement;

–   Tender document preparation for turnkey type procurement of the power plant / generator;

–   AMEZ landscape design;

–   Conceptual design and specification for design of jetty;

–   Preparation and making of bid for 25 MW power plant;

–   Revised layout of plots, roads etc.;

–   Preparation of design water body – side slopes, materials, green belt, walkway and landscape;

–   Preparation of design of fire station and hydrant & design the system;

–   Preparation of design of custom bonded area demarcation / fencing etc.;

–   Preparation of design of phasing / road map for CETP / WTP / road networks and all other utilities; and

–   Preparation of reports and engineering drawings of each and individual design works.

Assignment name:

 

SECONDARY TOWNS INTEGRATED URBAN DEVELOPMENT PROJECT IN LAOS PDR:

TA NO.: 2396-LAO

 

Funding agency: Asian Development Bank

 

Approx. value of the contract (in current US$):

 

US$ 598,000

Country: Bangladesh

Location within country: Luang Prabang, Savannakhet, Pakse & Thakhek

 

Duration of assignment (months): 06

Name of client:

 

Ministry of Communication, Transport, Posts and Construction, Laos PDR

Total no. of person-months of the assignment: 50

Address:

 

Laos PDR

Approx. value of the services provided by the firm under the contract (in current US$):

 

US$ 73,700

 

Start date (month/year): February, 1996

Completion date (month/year): July, 1996

No. of professional person-months provided by the joint venture partners or the sub-consultants: 43.5

 

Name of joint venture partner or sub-consultants, if any:

 

O’Sullivan&Graham, UK

Societe Mixte D’Etude ET De Developpement, Laos PDR

Name of senior full time employees of the firm involved and functions performed:

 

Socio-economist: Dr. AFM Mafizul Islam, Municipal Engineer: S.A. Hayat, GIS Specialist: Khaled Khurshid

 

Narrative description of project:

 

The Lao Secondary Towns Integrated Urban Development Project from the preparatory study to the second of the Bank’s involvement in the Urban Sector in Lao PDR. The objectives of this study were to:

 

–   to improve physical urban infrastructure, which will contribute to the improvement of the urban environment, to the  creation of job opportunities and to the reduction of urban poverty;

–   to support the process of the development of nation’s urban sector;

–   to encourage sustainable, de-centralised management of urban service.

 

Description of actual services provided in the assignment:

 

–   Detailed survey and inventory existing infrastructure

–   Assessed infrastructure needs

–   Prepared master plans

–   Planning system

–   Area upgrading

–   Socio-economic surveys

–   Infrastructure maps

–   Prepared infrastructure improvement proposal

–   Engineering design

–   Institutional framework

–   Financial and economical analysis

–   Draft final report.

 

Assignment name:

 

PREPARATION OF DETAILED AREA PLAN (DAP) FOR CHITTAGONG METROPOLITAN MASTER PLAN (CMMP)

 

Funding agency: Government of Bangladesh

Approx. value of the contract (in current US$):

 

US$ 718,078

Country: Bangladesh

Location within country: Chittagong Metropolitan Development Plan Area

Duration of assignment (months): 46

Name of client:

Chittagong Development Authority (CDA)

Total no. of person-months of the assignment: 240

Address:

 

CDA Building, Court Road, Chittagong

Approx. value of the services provided by the firm under the contract (in current US$):

 

US$ 694,350                

Start date (month/year): March, 2005

Completion date (month/year): December, 2008

No. of professional person-months provided by the joint venture partners or the sub-consultants: 24

Name of joint venture partner or sub-consultants, if any:

 

ODHIBASH (associate firm)

Name of senior full time employees of the firm involved and functions performed:

Team Leader: Kazi Golam Hafiz, GIS Specialist: Sarwar Hossain Khan, Transport Planning Expert: Dr. M. Rahmatullah, Drainage and Water Management Expert: Dr. Azizur Rahman, Town Planner: Zarina Hossain, Urban Planning Advisor: Chowdhury Fazle Bari, Infrastructure / Utility Engineer: Dr. M. Ataur Rahman, Environmental Analyst: AJM Alamgir, Statistical Analyst: Dr. AKM Ghulam Rabbani, Architect: Dr. Rashidul Hasan Khan,  Economist: Nazir Ahmed Gazi, Drainage Consultant / Planner: Md. Ali Ashraf

Narrative description of project:

The government has undertaking preparation of Detailed Area Plan (DAP) for Chittagong Metropolitan Master Plan (CMMP) on the basis of the Structure Plan and Urban Area Plan. Accordingly an area of about 1,30,000 acres (excluding restricted areas) has been considered for DAP preparation. A future 50,000 acres within the structure Plan boundary has been identified for survey and mapping only. But in reality, due to accommodation of the fast growing areas and growth centers outside City Corporation area, the surveyed area and planning area are extended up to 1,90,233 acres or 297 sq. mile (770 sq.km) and 1,70,702 acres or 267 sq. mile (691 sq.km) respectively. Out of the total surveyed area, 3801 acres are restricted area. The policy should represent the recommendations made in the Structure Plan as policies and Under Development Plan as guidelines.

Description of actual services provided in the assignment:

Surveys:

–   Primary and secondary control point establishment using RTK-GPS static survey technique;

–   Physical feature, topographic and landuse survey using Differential Global Positioning System (DGPS) and Total Station (TS);

–   GCP survey using RTK-GPS/DGPS/TS;

–   Socio-economic survey;

–   Environmental survey;

–   Traffic and transportation survey;

–   Economic activities survey; and

–   Development of GIS database.

Planning Packages:

The Detailed Area Plan (DAP) consists of:

–   Land use plan;

–   Development control and zoning plan;

–   Transportation network plans;

–   Drainage and environmental plans;

–   Utility services plans (gas/water supply/electricity/telephone);

–   New urban area development plan; and

–           Special project plans (Debarpar Lake Front Development Project / Karnaphuli River Front Development Project).

Assignment name:

 

PREPARATION OF STRUCTURE PLAN, MASTER PLAN AND DETAILED AREADEVELOPMENTPLANFORRAJSHAHIMETROPOLITANCITY

 

Funding agency: Government of Bangladesh

Approx. value of the contract (in current US$):

 

US$809,680     

Country: Bangladesh

Location within country: RajshahiMetropolitanCity and its environs

Duration of assignment (months): 35

Name of client:

Rajshahi Development Authority (RDA)

Total no. of person-months of the assignment: 456

Address:

 

RDA Bhaban, Banalata C/A, Rajshahi-6203

Approx. value of the services provided by the firm under the contract (in current US$):

 

US$809,680     

Start date (month/year): August, 2001

Completion date (month/year): June, 2004

No. of professional person-months provided by the joint venture partners or the sub-consultants: Nil

Name of joint venture partner or sub-consultants, if any:

 

None

Name of senior full time employees of the firm involved and functions performed:

 

Team Leader: Md. Shawkat Ali Khan, Transport Planning Expert: Dr. Mohammad Rahmatullah, Deputy Team Leader: Mahbubur Rahman, Urban Planner: Dr. Rashidul Hasan Khan, Urban Planner: Ms. Kaniz Abeda, Demographer/Statistician: Dr. A.K.M. Ghulam Rabbani, Urban Development Economist: Nazir Ahmed Gazi, Municipal Financial Analyst: Dr. Omar Haider Chowdhury, Hydrologist: Dr. Md. Ataur Rahman, Civil Engineer: Mesbahuddin Ahmed, Architect / Planner: Farzana Samiruddin, Environmental Analyst: AJM Alamgir/Golam Mostafa, GIS Expert: Md. Mosheur Rahman, Legal Expert: Mohammad Ismail

Narrative description of project:

In order to check urban sprawl, RDA intended to undertake survey and study for a total project area of 79,554 acres (about 322 sq. km) covering entire Rajshahi City Corporation Area, the existing area of Rajshahi Development Authority and part of Paba, Puthia and Charghat Upazilas. The plan period was for 20 years. The major objectives of the project were:

·      Determination of the present and future functional structure of the Metropolitan City;

·      Review of existing problems and proposed initiatives;

·      Preparation of plans for improving and guiding future development;

·      Preparation of regional recreational centre on the bank of the river PADMA;

·      Formulation of priority bankable projects;

·      Recommendations for institutional strengthening to improve management capacity of local authorities.

Description of actual services provided in the assignment:

Surveys:

–   Physical feature survey

–   Topographic survey

–   Landuse survey

–   Socio-economic survey

–   Environmental survey  

–   Traffic and transportation survey 

–   Economic activities survey.

The plan package:

–   Strategic plan;

–   Structure plan;

–   Urban area plan;

–   Detailed area plan.

CONSULTANT’S EXPERIENCE

Assignment name:

 

PREPARATION OF DETAILED AREA PLAN (DAP) FOR DHAKA-METROPOLITAN DEVELOPMENT PLANNING (DMDP) AREA, GROUP-C

 

Funding agency: Government of Bangladesh

 

Approx. value of the contract (in current US$):

 

US$ 452,077    

Country: Bangladesh

Location within country: Dhaka Metropolitan Development Plan Area

 

Duration of assignment (months): 71

Name of client:

Rajdhani Unnayan Kartripakkha (RAJUK)

 

Total no. of person-months of the assignment: 115

Address:

 

RAJUK Bhaban, Dilkusha C/A, Dhaka-1000

Approx. value of the services provided by the firm under the contract (in current US$):

 

US$ 226,050

 

Start date (month/year): August, 2004

Completion date (month/year): June, 2010

No. of professional person-months provided by the joint venture partners or the sub-consultants: 46

 

Name of joint venture partner or sub-consultants, if any:

 

Ganibangla (JV Lead Partner)

Name of senior full time employees of the firm involved and functions performed:

 

GIS Specialist: Mustafa Hasan, Transport Planning Expert: Dr. Mohammad Rahmatullah, Environment Expert: Md.Golam Mustafa, Water Management Expert: Dr.Md. Ataur Rahman, Utility Engineer: Md. Afzal Ahmed, Statistical Analyst: Dr. M. Moslehuddin

Narrative description of project:

 

The works of preparation of detailed area plan for DMDP-Group-C area has commenced officially from 3/8/2004. Group-C (Central Part) with a net area of 19911 acres consisting of 10 SPZ (1, 2, 3, 4, 5, 6, 7, 12, 13.1, 13.2) lies in central part of Dhaka Metropolitan Development Plan area is surrounded by the rivers Buriganga, Sitalakkha, Turag and Tongi Khal. Important establishments of the capital Dhaka like Bangladesh secretariat, Kawran Bazar commercial areas, International Airport, Old Dhaka etc. lie in this part. Most of the areas are under Dhaka City Corporation (DDC) Jurisdiction. The works involved are to determine the hierarchy of settlements based on population, economic activities, development pressure, social infrastructure provision, transport, flood protection, water supply, sanitation, environment protection etc. and detailed area planning and development. 

Description of actual services provided in the assignment:

 

–   Collection of reference materials, location maps, mouza maps (original C/S, and R/S), collection of geo-physical maps and reports, collection of topographical maps and reports and collection of basic statistics: present activities to determine the hierarchy of settlement based on population, economic activity, social infrastructure provision, transport links and related characteristics;

–   Forecasting on population and employment based on part trends with allowanced for growth rates;

–   Preparation and compilation of base map and demarcation of project boundary/area/location;

–   Geo-referencing of mouza maps, establishing of ground control points and conducting GPS and Total station survey;

–   Scanning of mouza maps and digitization of mouza maps;

–   Topographical survey, physical infrastructure survey, land use survey, socio-economic survey and transfer of all survey information to base map;

–   Commencing planning process for Detailed Area Plan based on higher level frameworks, people’s participation by communication and consultations, participation of public agencies, local communities, private developments and NGOs;

–   Preparation of maps for future land use, infrastructure developments, utility services, transport networks, drainage networks, water supply networks etc. for the proposed planning area.

 

Assignment name:

 

PREPARATION OF DETAILED AREA DEVELOPMENT PLAN FOR THE KHULNA MASTER PLAN (2001) AREA PROJECT

 

Funding agency: Government of Bangladesh

Approx. value of the contract (in current US$):

 

US$ 576,140                

Country: Bangladesh

Location within country: Khulna Development Authority Area

Duration of assignment (months): 20

Name of client:

 

Khulna Development Authority (KDA)

Total no. of person-months of the assignment: 434

Address:

 

KDA, Bhaban, Shibari, Khulna, Bangladesh

Approx. value of the services provided by the firm under the contract (in current US$):

 

US$ 403,300    

Start date (month/year): October, 2010

Completion date (month/year): Ongoing

No. of professional person-months provided by the joint venture partners or the sub-consultants: 40

Name of joint venture partner or sub-consultants, if any:

 

Data Experts (Pvt.) Ltd. (associate firm)

Name of senior full time employees of the firm involved and functions performed:

 

Team Leader: Kazi Golam Hafiz / Dr. Akhter Husain Chaudhury, Hydrologist:Dr. Azizur Rahman, Infrastructure Engineer: Md. Asaduzzaman, Architect: Chowdhury Fazle Bari, Environmental Planning Expert: Md. Golam Mustafa, Socio-Economist: Momtaz Shirin, Demographer/ Statistician: Dr. M. Mosleh-Uddin, Town Planner: Md. Amirul Islam

Narrative description of project:

 

The government has undertaking preparation of Detailed Area Planning (DAP) entire Master Plan Area will be considered as the Study Area. It will cover an area of 231.67 sq. km. (57,248 acre) which include the whole of Khulna City Corporation and Noapara Municipal Area, almost entire Fultala, Dighalia and Rupsa thanas, and parts of Batiaghata. Dumuria and Fakirhat thanas and will cover 93 numbers of Mouzas. The study area holds off 903,984 populations (BBS 1991) as the Khulna Master Plan 2001, the estimated population of the Master Plan Area in 2000 was 1,255,131. The entire Master Plan area should not be considered for Detailed Area Planning, this area is only for survey and study. After careful study of all factors the area for detailed area planning should be determined which will not be less than 30,000 acre of the total area.

Description of actual services provided in the assignment:

 

Surveys:

–   Primary and secondary control point establishment using RTK-GPS static survey technique;

–   Physical feature, topographic and landuse survey using Differential Global Positioning System (DGPS) and Total Station (TS);

–   GCP survey using RTK-GPS/DGPS/TS;

–   Socio-economic survey;

–   Environmental survey;

–   Traffic and transportation survey;

–   Economic activities survey; and

–   Development of GIS database.

 

Planning Packages:

The Detailed Area Plan (DAP) consists of:

–   Land use plan;

–   Development control and zoning plan;

–   Transportation network plans;

–   Drainage and environmental plans;

–   Utility services plans (gas/water supply/electricity/telephone);

–   New urban area development plan; and

–   Special project plans

Assignment name:

 

CONSULTANCY SERVICES FOR PREPARATION OF ACTION AREA PLAN FOR NARAYANGONJ CITY CORPORATION UNDER PREPARATION OF ACTION AREA PLAN FOR NARAYANGONJ AND GAZIPUR CITY CORPORATION

 

Funding agency: Government of Bangladesh

 

Approx. value of the contract (in current US$):

 

US$ 340,140    

 

Country: Bangladesh

Location within country: Naryangonj City Corporation

 

Duration of assignment (months): 15

Name of client:

 

Local Government Engineering Department

 

Total no. of person-months of the assignment: 168

Address:

 

LGED Bhaban, Agargaon, Sher-E-Bangla Nagar, Dhaka

Approx. value of the services provided by the firm under the contract (in current US$):

 

US$ 340,140    

Start date (month/year): May, 2015

Completion date (month/year): July, 2016

No. of professional person-months provided by the joint venture partners or the sub-consultants: Nil

 

Name of joint venture partner or sub-consultants, if any:

 

None

Name of senior full time employees of the firm involved and functions performed:

 

Team Leader: Dr. Mohammad Jahurul Hoque, Urban Planner: S.M Abdullah Al-Masum, Architect: Chowdhury Fazle Bari, Utility / Municipal Engineer: Md. Mustafizur Rahman, Environmental Expert: Md. Golam Mustafa PEng, GIS Specialist: Md. Nasim Haider, Transport Planning Expert: Surajit Saha

 

Narrative description of project:

 

Naryanganj, Siddirganj and Kodom Rasul City together declared to Naryanganj City Corporation dated on 05/05/2011. The area of the City Corporation is 72.43 sq. Km. The City Corporation has national importance due to closure to capital and dominating industrial and business activities. Considering geographical benefits every day numbers of infrastructure are constructed in these area.

 

Naryanganj City Corporation will be considered as the Study Area. Plans, maps and information from secondary sources will analysis for whole study area. The consultant will select the specific areas for Action Area Plan by consultation with project and city corporation authority. Areas of the Action Area Plan will cover approximate 60 percent of the City Corporation area.

 

The main objectives of the AAP project are as follows:

•  Formulation of Action Area Plan for provision of Municipal facilities to meet basic infrastructure needs;

•  Facilitate to improve environment of the Cities; and

•  To formulate polices for the best use of land and its control.

 

Description of actual services provided in the assignment:

 

–   Mobilization, Reconnaissance Survey, Consultation and Submission of Inception & Review Report;

–   Mouza Map Processing: Collection of CS, RS & latest (If available) Mouza Maps, Scanning, Digitization, Inventory;

–   Preparation of Land Use, Physical Feature, Topographic and Municipal Services/Facilities Identification Survey;

–   Others Survey:Traffic & Transportation, Drainage & Environmental, Socio-economic, Economy & Commerce, Collection of documents, secondary information and statistical data regarding demographic, economic, environmental, commerce and other relevant issues and

–   Submission of Final Reports (English & Bangla) and Plan Maps.

 

Assignment name:

MASTER PLAN PREPARATION FOR CONSULTANCY SERVICES: CONTRACT PACKAGE NO. 03, SELECTION 121801 (JOYPURHAT, CHAPAI NAWABGONJ, LALMONIRHAT, PANCHAGHAR, NETROKONA AND SHERPUR POURASHAVA) UNDER THIRD URBAN GOVERNANCE INFRASTRUCTURE IMPROVEMENT (SECTOR) PROJECT (UGIIP-III) – ADB LOAN NO. 3142 BAN

Funding agency: Asian Development Bank (ADB)

Approx. value of the contract (in current US$):

 

US$ 468,522    

Country: Bangladesh

Location within country: Dhaka and Rajshahi Division

 

Duration of assignment (months): 21

Name of client:

 

Local Government Engineering Department

 

Total no. of person-months of the assignment: 288

Address:

 

LGED Bhaban, Agargaon, Sher-E-Bangla Nagar, Dhaka

Approx. value of the services provided by the firm under the contract (in current US$):

 

US$ 468,522    

Start date (month/year): April, 2016

Completion date (month/year): On-going

No. of professional person-months provided by the joint venture partners or the sub-consultants: Nil

 

Name of joint venture partner or sub-consultants, if any:

 

None

Name of senior full time employees of the firm involved and functions performed:

 

Team Leader / Senior Urban Planner:Dr. Mohammad Jahurul Hoque, Urban Planner: Tanjima Akhter Chowdhury, Survey Expert: Kabir Ahmad, GIS & Image Specialist: Nazma Khatun, Transport Planning Expert: Lipika Khan, Environment & Disaster Management Expert: AJM Alamgir, Geologist: Golam Morshed, Urban Economist: Probir Kumar Dey, Municipal Engineer: Md. Atiqur Rahman, Financial Expert: Nayeema Zareen Bashar, Junior Urban Planner-1: Bibi Khadiza, Junior Urban Planner-2: Kaokab Hasnain, Surveyor-1: Ahamadur Rahman, Surveyor-2: Md. Abdul Hasib, Office Manager / Accountant-1, Computer Operator-1, Office Assistant-1

Narrative description of project:

“The primary objectives of the project is to promote sustainable human development economic growth and poverty reduction by improving urban governance, developing urban infrastructure and services, enhancing municipal management and strengthening capacity to deliver municipal services (especially to the poor) in 30 target Pourashavas of Bangladesh.” To achieve this objective, the project will assist the selected Pourashavsa to:

·    Improve Urban Governance by implementing a set of programs;

·    Increase Transparency and accountability of Pourashavas towards their citizens;

·    Provide improved physical Infrastructure and urban services;

·    Enhance capacity of Pourashavas to implement, operate, manage and maintain basic urban services;

·    Provide capacity building support to the elected representatives, citizen representatives and official regarding governance improvement and infrastructures developments;

·    Make contribution towards future sustainability of governance improvement and infrastructure development activities.

Description of actual services provided in the assignment:

Surveys:

–   Base map survey, topographic survey, physical feature survey,           land use survey, socio-economic/household survey,scheme identification survey, environmental survey, traffic and transportation survey, and  economic activities survey.

 

 

The plan package:

–   Structure plan, land use plan, transportation and traffic management plan, drainage and utility services plan, environmental and disaster management plan, urban services plan, and financial investment plan.

 

Preparation of maps and reports:

–   Preparation of maps and plans and preparation of inception report, survey report, draft master plan report and final master plan report.

Assignment name:

MASTER PLAN PREPARATION FOR CONSULTANCY SERVICES: CONTRACT PACKAGE NO. 02, SELECTION 121799 UNDER THIRD URBAN GOVERNANCE INFRASTRUCTURE IMPROVEMENT (SECTOR) PROJECT (UGIIP-III) [ADB LOAN NO. 3142 BAN]

Funding agency: Asian Development Bank (ADB)

Approx. value of the contract (in current US$):

US$ 343,565    

Country: Bangladesh

Location within country: Dhaka and Khulna Division

Duration of assignment (months): 18

Name of client:

Local Government Engineering Department

 

Total no. of person-months of the assignment: 176

Address:

LGED Bhaban, Agargaon, Sher-E-Bangla Nagar, Dhaka

Approx. value of the services provided by the firm under the contract (in current US$):

US$ 343,565    

Start date (month/year): April, 2016

Completion date (month/year): September, 2017

No. of professional person-months provided by the joint venture partners or the sub-consultants: Nil

 

Name of joint venture partner or sub-consultants, if any:

 

None

Name of senior full time employees of the firm involved and functions performed:

Team Leader / Senior Urban Planner:Md. Saifulla Dostogir, Urban Planner: Madhuri Rani Roy, Survey Expert: Shyamal Krishna Howlader, GIS & Image Specialist: Nasim Haider, Transport Planning Expert: Surajit Saha, Environment & Disaster Management Expert: AJM Alamgir, Geologist: Golam Morshed, Urban Economist: Probir Kumar Dey, Municipal Engineer: Md. Mustafizur Rahman, Financial Expert: Nayeema Zareen Bashar, Junior Urban Planner-1: Sanjib Saha, Junior Urban Planner-2: Tamanna Salam, Surveyor-1: Md. Abdul Koddus, Surveyor-2: Syed Al-Amin, Office Manager / Accountant-1, Computer Operator-1, Office Assistant-1

Narrative description of project:

“The primary objectives of the project is to promote sustainable human development economic growth and poverty reduction by improving urban governance, developing urban infrastructure and services, enhancing municipal management and strengthening capacity to deliver municipal services (especially to the poor) in 30 target Pourashavas of Bangladesh.” To achieve this objective, the project will assist the selected Pourashavsa to:

·    Improve Urban Governance by implementing a set of programs;

·    Increase transparency and accountability of Pourashavas towards their citizens;

·    Provide improved physical infrastructure and urban services;

·    Enhance capacity of Pourashavas to implement, operate, manage and maintain basic urban services;

·    Provide capacity building support to the elected representatives, citizen representatives and official regarding governance improvement and infrastructures developments;

Make contribution towards future sustainability of governance improvement and infrastructure development activities

Description of actual services provided in the assignment:

Surveys:

–   Base map survey, topographic survey, physical feature survey,           land use survey, socio-economic/household survey,scheme identification survey, environmental survey, traffic and transportation survey, and  economic activities survey.

 

The plan package:

–   Structure plan, land use plan, transportation and traffic management plan, drainage and utility services plan, environmental and disaster management plan, urban services plan, and financial investment plan.

 

Preparation of maps and reports:

–   Preparation of maps and plans and preparation of inception report, survey report, draft master plan report and final master plan report.

Assignment name:

 

CONSULTING SERVICES FOR PREPARATION OF MASTER PLAN FOR POURASHAVAS UNDER UPAZILA TOWNS INFRASTRUCTURE DEVELOPMENT PROJECT – PACKAGE NO. 12

 

Funding agency: Government of Bangladesh

Approx. value of the contract (in current US$):

 

US$ 279,840    

 

Country: Bangladesh

Location within country: 22 Pourashavas such as Khuksha, Mirpur, Bheramara, Kumarkhali, Gangni, Kotchandpur, Moheshpur, Shailkupa, Kaligonj, Harinakunda, Jibonnagar, Darsana, Alamdanga, Nowapara, Jhikorgacha, Keshabpur, Monirampur, Bagharpara, Paikgacha, Kalaroa, Morelgonj and Monglaport

Duration of assignment (months): 85

Name of client:

Local Government Engineering Department, GoB

 

Total no. of person-months of the assignment: 150

Address:

RDEC Bhaban (Level-9), Agargaon, Sher-E-Bangla Nagar, Dhaka-1207

Approx. value of the services provided by the firm under the contract (in current US$):

US$ 223,875    

Start date (month/year): March, 2008

Completion date (month/year): March, 2015

No. of professional person-months provided by the joint venture partners or the sub-consultants: 30

 

Name of joint venture partner or sub-consultants, if any:

 

Divine Associates Ltd. (JV Partner)

Name of senior full time employees of the firm involved and functions performed:

 

Team Leader: Md. Amirul Islam, Deputy Team Leader: Momtaz Shirin, Urban Planner-1: ANM Shahidul Islam, Urban Planner-2: SM Abdullah Al-Masum, Demographer / Statistician: Shyamal Krishna Howlader, Urban Development Economist: Dr. ABM Murshed Alam Siddiqui, Transport Planning Expert: Md. Liaquat Hossain, Municipal Engineer: Md. Ghulam Rabbani, Architect Planner: Md. Ekramul Huq Khan, Environmental Analyst: Dr. Dilip Kumar Datta, GIS Specialist: Dr. Md. Mizanur Rahman, Legal Expert: Raquibul Haque Miah

Narrative description of project:

Bangladesh shows rapid increase in its urban population. The average growth rate of population between 1961 1980 was 8 percent. The rate is reduced to 6 percent during the period 1981-1990. Although the growth rate of urban population is on the decline this rate may not go below 4 percent by the year 2010. According to the population census of 2001 at present about 23.39 percent of the total population of the country or about 29 million people live in the urban areas. As per demand of people the transformation of important urban areas into Pourashavas is continuing to ensure planned development of Pourashavas and the total number of Pourashavas now stands nearly 300. Out of these 300 Pourashavas a total of 223 Pourashavas and Kuakata Tourism Centre development programme is undertaken Upazila Towns Infrastructure Development Project.

Description of actual services provided in the assignment:

 

Survey:

–   Primary and secondary control  Point establishment using RTK-GPS static survey technique;

–   Physical feature, topographic and land use survey using Differential Global  Positioning System (DGPS) and Total Station (TS);

–   GCP survey using RTK-GPS/DGPS/TS;

–   Socio-economic survey;

–   Traffic and transportation survey;

–   Economic activities survey; and

 

Planning Packages:

The Structure Plan, Urban Area Plan and Ward Action Plan consist of:

–   Land use plan;

–   Traffic and Transportation Management Plan;

–   Drainage and environmental Management Plan;

–   Utility Services Plan; and

–   Ward Action Plan

Assignment name:

 

CONSULTING SERVICES FOR PREPARATION OF MASTER PLAN FOR POURASHAVAS UNDER UPAZILA TOWNS INFRASTRUCTURE DEVELOPMENT PROJECT – PACKAGE NO. 10

 

Funding agency: Government of Bangladesh

Approx. value of the contract (in current US$):

 

US$ 203,537    

 

Country: Bangladesh

Location within country: 16 Pourashavas such as Goalunda, Pangsha, Bhanga, Bualmari, Nagarkanda, Shibchar, Kalkini, Tongipara, Lohagara, Kalia, Damuda, Jazira, Bhadorgonj, Naria, Kotalipara and Moksedpur

Duration of assignment (months): 85

Name of client:

Local Government Engineering Department, GoB

 

Total no. of person-months of the assignment: 150

Address:

RDEC Bhaban (Level-9), Agargaon, Sher-E-Bangla Nagar, Dhaka-1207

 

Approx. value of the services provided by the firm under the contract (in current US$):

US$ 162,830

 

Start date (month/year): March, 2008

Completion date (month/year): March, 2015

No. of professional person-months provided by the joint venture partners or the sub-consultants: 30

Name of joint venture partner or sub-consultants, if any:

 

Divine Associates Ltd. (JV Partner)

Name of senior full time employees of the firm involved and functions performed:

Team Leader: Dr. Mohsin Uddin Ahmed, Deputy Team Leader: Dr.Md. Ashraful Alam, Urban Planner-1: Mohammad Ali Ashraf, Urban Planner-2: Mohammad Zahir Ahmed, Demographer/ Statistician: Nurul Islam Siddiquee, Urban DevelopmentEconomist: Dr. M.A. Momin, Transport Planning Expert: Shishir Kumar Shil, Municipal Engineer: Md. Asaduzzaman, Architect Planner: Md.Mustafa Hasan, Environmental Analyst: AJM Alamgir, GIS Specialist: Md. Sarwar Hossain Khan, Legal Expert: Dr.Md. Parvez Sattar

 

Narrative description of project:

 

Bangladesh shows rapid increase in its urban population. The average growth rate of population between 1961-1980 was 8 percent. The rate is reduced to 6 percent during the period 1981-1990. Although the growth rate of urban population is on the decline this rate may not go below 4 percent by the year 2010. According to the population census of 2001 at present about 23.39 percent of the total population of the country or about 29 million people live in the urban areas. As per demand of people the transformation of important urban areas into Pourashavas is continuing to ensure planned development of Pourashavas and the total number of Pourashavas now stands nearly 300. Out of these 300 Pourashavas a total of 223 Pourashavas and Kuakata Tourism Centre development programme is undertaken Upazila Towns Infrastructure Development Project.

 

Description of actual services provided in the assignment:

 

Survey:

–   Primary and secondary control  Point establishment using RTK-GPS static survey technique;

–   Physical feature, topographic and land use survey using Differential Global  Positioning System (DGPS) and Total Station (TS);

–   GCP survey using RTK-GPS/DGPS/TS;

–   Socio-economic survey;

–   Traffic and transportation survey;

–   Economic activities survey; and

 

Planning Packages:

The Structure Plan, Urban Area Plan and Ward Action Plan consist of:

–   Land use plan;

–   Traffic and Transportation Management Plan;

–   Drainage and environmental Management Plan;

–   Utility Services Plan; and

–   Ward Action Plan

Assignment name:

 

CONSULTING SERVICES FOR PREPARATION OF MASTER PLAN FOR POURASHAVAS UNDER UPAZILA TOWNS INFRASTRUCTURE DEVELOPMENT PROJECT – PACKAGE NO. 01

 

Funding agency: Government of Bangladesh

Approx. value of the contract (in current US$):

 

US$ 267,140    

 

Country: Bangladesh

Location within country: 21 Pourashavas such as Gopalpur, Sakipur, Ghatail, Kalihati, Madhupur, Bhuapur, Dhanbari, Mirzapur, Sreerpur, Kaliakoir, Monohardi, Madhabdi, Gorashal, Mirkadeem, Kadamrasul, Soanrgaon, Kanchan, Tarabo, Joypara (Dohar), Dhamrai, Singair

Duration of assignment (months): 85

Name of client:

Local Government Engineering Department, GoB

Total no. of person-months of the assignment: 150

Address:

RDEC Bhaban (Level-9), Agargaon, Sher-E-Bangla Nagar, Dhaka-1207

Approx. value of the services provided by the firm under the contract (in current US$):

US$ 213,715    

Start date (month/year): March, 2008

Completion date (month/year): March, 2015

No. of professional person-months provided by the joint venture partners or the sub-consultants: 30

Name of joint venture partner or sub-consultants, if any:

 

Divine Associates Ltd. (JV Partner)

Name of senior full time employees of the firm involved and functions performed:

Team Leader: Kazi Golam Hafiz, Deputy Team Leader: Kaniz Abeda, Urban Planner-1: Chowdhury Fazle Bari, Urban Planner-2: Kazi Md. Raziul Hossain, Demographer/ Statistician: Dr. M. Mosleh-Uddin, Urban DevelopmentEconomist: Dr. Tanvir Ahmed Khan, Transport Planning Expert: AKM Shamsul Huda, Municipal Engineer: Dr. Azizur Rahman, Architect Planner: Dr. Fuad Hassan Mallick, Environmental Analyst: Md. Golam Mustafa, GIS Specialist: Syed Shaheed Kamal, Legal Expert: Dr. AKM Aktharul Kabir

 

Narrative description of project:

 

Bangladesh shows rapid increase in its urban population. The average growth rate of population between 1961-1980 was 8 percent. The rate is reduced to 6 percent during the period 1981-1990. Although the growth rate of urban population is on the decline this rate may not go below 4 percent by the year 2010. According to the population census of 2001 at present about 23.39 percent of the total population of the country or about 29 million people live in the urban areas. As per demand of people the transformation of important urban areas into Pourashavas is continuing to ensure planned development of Pourashavas and the total number of Pourashavas now stands nearly 300. Out of these 300 Pourashavas a total of 223 Pourashavas and Kuakata Tourism Centre development programme is undertaken Upazila Towns Infrastructure Development Project.

 

Description of actual services provided in the assignment:

 

Survey:

–   Primary and secondary control  Point establishment using RTK-GPS static survey technique;

–   Physical feature, topographic and land use survey using Differential Global  Positioning System (DGPS) and Total Station (TS);

–   GCP survey using RTK-GPS/DGPS/TS;

–   Socio-economic survey;

–   Traffic and transportation survey;

–   Economic activities survey; and

 

Planning Packages:

The Structure Plan, Urban Area Plan and Ward Action Plan consist of:

–   Land use plan;

–   Traffic and Transportation Management Plan;

–   Drainage and environmental Management Plan;

–   Utility Services Plan; and

–   Ward Action Plan

 

Assignment name:

 

CONSULTANCY SERVICES FOR PREPARATION OF MASTER PLAN FOR POURASHAVAS UNDER DISTRICT TOWNS INFRASTRUCTURE DEVELOPMENT PROJECT – PACKAGE NO.: DTIDP/2007-2008/S01

 

Funding agency: Government of Bangladesh

Approx. value of the contract (in current US$):

 

US$ 121,695

 

Country: Bangladesh

Location within country: 4 Pourashavas such as Noakhali, Chandpur, Magura and Tangail

Duration of assignment (months): 74

Name of client:

Local Government Engineering Department, GoB

 

Total no. of person-months of the assignment: 150

Address:

 

RDEC Bhaban (Level-9), Agargaon, Sher-E-Bangla Nagar, Dhaka-1207

Approx. value of the services provided by the firm under the contract (in current US$):

US$ 97,355

 

Start date (month/year): May, 2008

Completion date (month/year): June, 2014

No. of professional person-months provided by the joint venture partners or the sub-consultants: 21

Name of joint venture partner or sub-consultants, if any:

 

Divine Associates Ltd. (JV Partner)

Name of senior full time employees of the firm involved and functions performed:

Team Leader: Md.Ziaul Haque, Deputy Team Leader: Kaniz Abeda, Urban Planner-1: Chowdhury Fazle Bari, Urban Planner-2: Dr.Md. Ashraful Alam, Demographer/ Statistician: Nurul Islam Siddiquee, Urban DevelopmentEconomist: Dr. M.A. Momin, Transport Planning Expert: Shishir Kumar Shil, Municipal Engineer: Md. Asaduzzaman, Architect Planner: Md. Mustafa Hasan, Environmental Analyst: AJM Alamgir

 

Narrative description of project:

 

About 23% of the populations of Bangladesh live in urban areas in 1971 the urban population of Bangladesh was 5.5 million while in 2001 the population rose to 29 million. The present trend of population increase indicates that by 2020 about 40% of the total population of Bangladesh will live in urban areas. According to a recent survey it was revealed that 45% of urban population have access to potable water while of 20% have access to sewerage facilities in addition inefficient transport management greatly contributes to the problems in traffic and transportation system. These aspects not only influence our urban live but also arrest the national economic growth of the country. On the other hand, demand for urban service facilities has increased substantially because of the population explosion in urban areas.

Description of actual services provided in the assignment:

 

Surveys:

–     Primary and secondary control point establishment using RTK-GPS static survey technique;

–   Physical feature, topographic and land use survey using Differential Global Positioning System (DGPS) and Total Station (TS);

–     GCP survey using RTK-GPS/DGPS/TS;

–     Socio-economic survey;

–     Environmental survey;

–     Traffic and transportation survey;

–     Economic activities survey; and

–     Development of GIS database.

 

 

Planning Packages:

The Structure Plan, Urban Area Plan and Detailed Area Plan (Ward Action Plan) consists of:

–     Land use plan;

–     Development control and zoning plan;

–     Transportation network plans;

–     Drainage and environmental plans;

–     Utility services plans (gas/water supply/electricity/telephone); and

–     New urban area development plan.

–      

Assignment name:

 

SPECIAL ASSISTANCE FOR PROJECT IMPLEMENTATION (SAPI): CONSULTING SERVICES ASSIGNMENT FOR ARAIHAZAR ECONOMIC ZONE UNDER FOREIGN DIRECT INVESTMENT PROMOTION PROJECT (FDIPP)

 

Funding agency: Japan International Cooperation Agency (JICA)

 

Approx. value of the contract (in current US$):

 

 US$ 187,200               

Country: Bangladesh

Location within country: Araihazar, Narayanganj

Duration of assignment (months): 12

Name of client:

 

Japan Development Institute Ltd. (JDI)

 

Total no. of person-months of the assignment: 33.66

Address:

 

Itsuro Build. 5F, 3-7-2 Kandanishiki-cho, Chiyoda-ku, Tokyo 101-0054, Japan

 

Approx. value of the services provided by the firm under the contract (in current US$):

 

US$ 187,200                            

Start date (month/year): July 16, 2017

Completion date (month/year): June 29, 2018

No. of professional person-months provided by the joint venture partners or the sub-consultants:

 

 

Name of joint venture partner or sub-consultants, if any:

 

None

Name of senior full time employees of the firm involved and functions performed:

 

Senior Civil Engineer: Md. Shamsul Alam Siddiqui, Sr. Electrical Engineer: Subodh Chandra Biswas, Land Grading: Md. Masudur Rahman, Water Supply / Geotechnical Engineer: Souptik Barman Tirtha, Drainage Engineer: Mariam Akhtar, Gas Supply Engineer: Md. Imrul Hasan, Telecommunication Engineer: Golam Kibria Talukder, Transmission Line Engineer: Sanat Kumar Das, Mechanical Engineer (Engine and Fuel): Ahsan Habib, Solid Waste Management Specialist: Mustafizur Rahman / Bibi Khadiza, Security Management Specialist: Md. Ishtiak Hossain, Environmental Specialist: Dr. Jahurul Hoque, Cost Estimator: Sk. Ashik Mahmud, Economical / Financial Analysis: Nayeema Zareen Bashar, CAD Operator-1: Abdus Salam, CAD Operator-2: Mofazzel Hossain

 

Narrative description of project:

The objective of the project is to ensure the smooth flow of funds to enterprises that have intention to enter or invest in EZs (including existing EPZs & PEPZs), and improve the investment climate of EZs by providing funds through the participating financial institutions (PFIs), and constructing on and off-site infrastructure of EZs, thereby contributing to private investment including foreign enterprises in Bangladesh.

DDC shall assist to Japan Development Institute Ltd. (JDI) for formulating Master Plan for Araihazar Economic Zone (500 acre) in Narayanganj, which will be developed by the Government-to-Government base economic zone project also known as Foreign Direct Investment Promotion Project (FDIPP).

Objectives as specified below:

(1)  Power Sub-Station (50-100 MW) utilizing the existing 230 kV transmission line within the EZ site.

(2)  Power Plant of LNG-based 50-80 MW adjacent to the sub-station.

(3)  Treatment facility for waste water and rain water discharge drainage and possible improvement of cannel leading to the nearby river.

(4)  Telecommunication connection including fixed telephones and the Internet access.

(5)  Access road to the site (can be a part of Araihazar EZ).

(6)  Identifying disposal site(s) and treatment methods for all kinds of wastes that are to be managed.

(6)  EIA/RAP clearance of the proposed EZ site.

 

Description of actual services provided in the assignment:

–  Collecting necessary information, and for communication / coordination with BEZA and relevant Government offices;

–  Soil examination, river survey for waste water discharge, and collecting necessary information;

–  Water analysis of rain water / drainage treatment and collecting necessary information;

–  Gas demand study, communicate / coordinate with BEZA and relevant Government offices;

–  Telecommunication demand study, and communicate / coordinate with BEZA and relevant Government offices;

–  Power plant / substation demand study;

–  Provide necessary information for Engine and Fuel for power generation;

–  Collecting necessary information, study current solid waste management;

–  Security management and for collecting necessary information;

–  Collecting necessary information, provide advices for environmental and social impact related issues, and assist / management EIA study;

–  Collecting necessary information and cost estimation for sub-infrastructure projects;

–  Collecting necessary information and for overall economic / financial analysis (including sub-infrastructure projects);

–  Supporting for drafting Master Plan and DPPs for Off-Site infrastructure; and

–  Supporting for power & energy sector as well as power & energy distribution for the Economic Zone and drafting DPP for the sub-station and the power plant.

 

Assignment name:

 

CONSULTING SERVICES FOR PREPARATION OF DETAILED MASTER PLAN, DRAWINGS, DESIGN, SOIL TEST & PRICED BILLS OF QUANTITIES, SPECIFICATIONS ETC. FOR 14 STORIED WITH 3 BASEMENT SENA PARIBAR KALYAN SAMITY (SPKS) BUILDING “SADHINATA TOWER” AT DHAKA CANTONMENT, DHAKA

 

Funding agency: Sena Paribar Kalyan Samity (SPKS)

Approx. value of the contract (in current US$):

 

US$ 155,314                

Country: Bangladesh

Location within country: Premises of SPKS at Dhaka Cantonment, Dhaka

Duration of assignment (months): 97

Name of client:Sena Paribar Kalyan Samity (SPKS)

Total no. of person-months of the assignment: 172

Address:Dhaka Cantonment, Dhaka

Approx. value of the services provided by the firm under the contract (in current US$):

US$145,617                  (Tk. 10,812,070)

Start date (month/year): December, 2007

Completion date (month/year): December, 2015

No. of professional person-months provided by the joint venture partners or the sub-consultants: 14

Name of joint venture partner or sub-consultants, if any:

 

Vaastukalpa Architects (Sub-consultant)

Name of senior full time employees of the firm involved and functions performed:

Team Leader: AKM Nasiruddin / Md. Mustafa Hasan, Sr. Structural Engineer: Abdur Rashid, Structural Engineer: Zayedur Rahim, Foundation Engineer: Iftekhar Ahmed Khan, Plumbing & Sanitary Engineer: AJM Alamgir, Electrical Engineer: Afzal Ahmed, Mechanical Engineer: Abu Bakr Siddique, Documentation Engineer: Md. Sarwar Alam, Environment Specialist: Md. Golam Mustafa, Resident Engineer: Sayeduzzaman Mian / Md. Taskinur Rahman, Assistant Resident Engineer (Civil): Md. Saifuddin Ahmed, Assistant Resident Engineer (Elect.): Md. Sujatul Islam, Diploma Engineer (Civil): Md. Ismail Khan, Diploma Engineer (Elect): Sanat Kumar Das, Diploma Engineer (Mech.): BAM Shamsuzzaman

Narrative description of project:

 

Trust Bank Limited has entered into an agreement with Sena Paribar Kalyan Samity (SPKS), a registered society, for construction of a 14-storied including 3 (three) basement building at the premises of SPKS at Dhaka Cantonment, Dhaka. Plinth area 1625 sq.m with A/C, lift, sub-station, standby generator, car parking, auditorium, fire fighting system, water, sanitary and gas connection system.

Description of actual services provided in the assignment:

 

–   Site survey and preparation of master plan;

–   Sub-soil investigation;

–   Preparation of architectural design and drawings;

–   Preparation of structural design and drawings;

–   Preparation of electrical system design and drawings including sub-station, generator, area and security lighting, fire-detection, alarm system, P.A. system, computer networking, auditorium lighting and sound system etc.;

–   Preparation of plumbing and sanitation design and drawings;

–   Preparation of fire-fighting system design and drawings;

–   Preparation of passenger lift design and drawings;

–   Preparation of air-conditioning system design and drawings;

–   Preparation of cost estimate, tender document, bid evaluation for structural, electrical, mechanical services;

–   Assisted in pre-qualifying contractors;

–   Assisted in pre-bid meetings and contract negotiations;

–   Preparation of award of contract;

–   Construction supervision and quality control during implementation;

–   Overall project management and monitoring.

Assignment name:

 

18-STORIED CORPORATE HEADOFFICEBUILDING OF DELTA LIFE INSURANCE COMPANY LTD. AT GULSHAN, DHAKA

 

Funding agency: Delta Life Insurance Company Limited

Approx. value of the contract (in current US$):

 

US$ 316,270                

 

Country: Bangladesh

Location within country: Gulshan, Dhaka

Duration of assignment (months): 124

 

Name of client:Delta Life Insurance Company Limited

Total no. of person-months of the assignment: 413

Address:

 

90-91, Motijheel C/A, Dhaka

Approx. value of the services provided by the firm under the contract (in current US$):

US$316,270                 

Start date (month/year): Design phase: September, 1998; Construction supervision phase:January, 2005

Completion date (month/year): Design phase: December, 2000; Construction supervision phase: December, 2012

No. of professional person-months provided by the joint venture partners or the sub-consultants: Nil

 

Name of joint venture partner or sub-consultants, if any:

 

None

 

Name of senior full time employees of the firm involved and functions performed:

 

Team Leader / Project Manager: Anwar Husain / AKM Nasiruddin, Survey Specialist: Bazlur Rahman, Sr. Electrical Engineer: Afzal Ahmed, Geotechnical Expert: Md. Serajuddin, Principal Architect: Mustafa Hasan, Sr. Architect: Mahmud Hasan, Sr. Air-conditioning Engineer: Md. Sayedul Islam, Sr. Mechanical Engineer: Abu Bakr Siddique, Chief Structural Engineer: AKM Rafiquddin / Dr. Gholam Mostofa, Sr. Structural Engineer: Md. Abdur Rashid, Structural Engineer: Md. Golam Mostafa, Sr. Electrical Engineer: Md. Bazlur Rahman, Sr. Electrical Engineer: Afzal Ahmed, Sr. Water Supply and Sewerage, System Engineer: AJM Alamgir, Sanitary Engineer: Hafizur Rahman Khan, Quantity Survey and Contract Doc. Engineer: Md. Sarwar Alam, Material / Cost Engineer: Md. Arshad Ali, Resident Engineer (Civil): S. Rahman Bhuiyan, Assistant Resident Engineer (Civil): Prokash Ch. Biswas, Assistant Resident Engineer (Elect.): Kazi Jaynal Abedin, Assistant Resident Engineer (Mech.): Shamsul Hoque Foraji, Site Engineer (Elect.): Md. Abdul Hamid, Site Engineer (Civil): 3 (three)

Narrative description of project:

Construction of 18-storeid corporate head office building at Gulshan, Dhaka with three basement floors and covering 10,000 sft. plinth area. The project includes central air-conditioning systems-1350 RT, sub-station-1500 KVA, lift, fire-detection, fire-fighting systems, P.A. system, 750 persons capacity auditorium, acoustics treatment etc.

Description of actual services provided in the assignment:

  • Topographical survey of the site
  • Sub-soil investigation and foundation design, drawings, etc.
  • Preparation of layout plan, master plan, preparation of preliminary architectural plan, detail section, elevation, etc.
  • Preparation of final architectural drawings
  • Preparation of structural design and detailed working drawings showing detailed bar diagram, etc.
  • Preparation of electrical and mechanical design and drawings including lift, HVAC, etc.
  • Preparation of sanitary and water supply works design and drawing
  • Preparation of detailed estimates (component wise)
  • Preparation of tender documents

Detailed supervision (Construction complete up to Level-0 to Level-14 with 3 basement floors)

Assignment name:

ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES FOR CONSTRUCTION OF MULTI-STORIED (14-STORIED) OFFICE BUILDING COMPLEX OF THE DHAKA STOCK EXCHANGE LIMITED AT NIKUNJA, DHAKA

Funding agency: Dhaka Stock Exchange Ltd.

Approx. value of the contract (in current US$):

 

US$ 818,603                

Country: Bangladesh

Location within country: Nikunja, Dhaka

Duration of assignment (months): 69

Name of client:Dhaka Stock Exchange Ltd.

Total no. of person-months of the assignment: 400

Address:

Stock Exchange Building, 9/F Motijheel C/A, Dhaka‑1000

Approx. value of the services provided by the firm under the contract (in current US$):

US$ 818,603                

Start date (month/year): Design Phase:April, 2006; Construction supervision phase: January, 2011

Completion date (month/year): Design Phase: March, 2007; Construction supervision phase: September, 2015

No. of professional person-months provided by the joint venture partners or the sub-consultants: Nil

Name of joint venture partner or sub-consultants, if any:

 

None

Name of senior full time employees of the firm involved and functions performed:

 

Team Leader: AKM Nasiruddin, Project Coordinator / Documentation Engineer: Sarwar Alam, Senior Architect: Mahmud Hasan, Architect: Fahmida Haque, Structural Engineer: Kishore Kumar Sikder, Electrical Engineer: Subodh Ch. Biswas, Mechanical Engineer: Abu Bakr Siddique, Sanitary & Plumbing Engineer: KM Idrisur Rahman, Soil Expert / Geologist: Md. Sirajuddin, Civil / Resident Engineer: Sayeeduzzaman Mian

Narrative description of project:

Dhaka Stock Exchange Ltd. construct a 14-storied building at their own land (1.33 acres) at Nikunja, Dhaka. The complex having 3 (three) basements and 45,000 sft. area of each floor (total floor area 704,740.5 sft.) including members rooms, training hall, club facilities for members, 656 person capacity auditorium, seminar room, cafeteria, prayer hall, car parking, telex room, staircase, elevators, smoke detectors and fire alarm system, air-conditioning, sub-station, water supply and deep tube-well, fire hydrants and fire water supply, gas connection, telephone, garbage disposal, roads, boundary wall and gate house, central security system, landscaping and garden lighting, etc.

Description of actual services provided in the assignment:

–   Site survey and preparation of master plan;

–   Sub-soil investigation;

–   Preparation of architectural design and drawings;

–   Preparation of interior design and drawings;

–   Preparation of structural design and drawings;

–   Preparation of electrical system design and drawings including sub-station, standby generator, area and security lighting, fire-detection, alarm system, P.A. system, computer networking, auditorium lighting and sound system etc.;

–   Preparation of plumbing and sanitation design and drawings;

–   Preparation of fire-fighting system design and drawings;

–   Preparation of passenger lift design and drawings;

–   Preparation of air-conditioning system design and drawings;

–   Preparation of cost estimate, tender document, bid evaluation for structural, electrical, mechanical services;

–   Assist Dhaka Stock Exchange Ltd. in pre-qualifying contractors;

–   Assist Dhaka Stock Exchange Ltd. in pre-bid meetings and contract negotiations;

–   Preparation of award of contract;

–   Construction supervision and quality control during implementation;

–           Overall project management and monitoring.

Assignment name:

 

MULTISTORIED (12-STORIED) ACADEMIC BUILDING OF BANGLADESH UNIVERSITY OF ENGINEERING AND TECHNOLOGY (BUET) AT WEST PALASHI, DHAKA

 

Funding agency: Bangladesh University of Engineering and Technology (BUET)

 

Approx. value of the contract (in current US$):

 

US$ 84,200      

 

Country: Bangladesh

Location within country: West Palashi, Dhaka

 

Duration of assignment (months): 94

Name of client:

 

Bangladesh University of Engineering and Technology (BUET), Comptroller, BUET Campus, West Palashi, Dhaka

 

Total no. of person-months of the assignment: 157

Address:

 

West Palashi, Dhaka

 

Approx. value of the services provided by the firm under the contract (in current US$):

 

US$ 84,200      

 

Start date (month/year): September, 2001

Completion date (month/year): June, 2009

No. of professional person-months provided by the joint venture partners or the sub-consultants: Nil

 

Name of joint venture partner or sub-consultants, if any:

 

None

Name of senior full time employees of the firm involved and functions performed:

 

Director-in-Charge: AKM Nasiruddin, Project Coordinator: Golam Mostafa, Senior Architect: Ekramul Huq Khan, Architect: Ishtiak Ahmed Taslim, Architect: Mahnud Hasan, Sr. Structural Engineer: Md. Abdur Rashid, Structural Engineer: Kishore Kumar Sikder, Electrical Engineer: Shah Alam Talukder, Mechanical Engineer: Abu Bakr Siddique, Sanitary and Plumbing Engineer: AJM Alamgir, Foundation Engineer: Iftekhar Ahmed Khan

Narrative description of project:

 

Bangladesh University of Engineering and Technology (BUET) construct one no. of 12-storied Academic Building with single basement having 37,550 sft. plinth area at west Palashi, Dhaka. This building will have classrooms, lecture theatre (gallery with multimedia support), laboratories, teacher’s rooms, computer rooms, departmental libraries and other usual facilities of an academic building.

 

Description of actual services provided in the assignment:

 

–   Preparation of layout plan of the buildings

–   Preparation of architectural plans, structural design, electrical and mechanical design

–   Preparation of 3D perspective view of the buildings

–   Preparation of landscaping

–   Preparation of complete report on architectural and structural design

–   Top supervision of construction works (1st phase up to 8th floor).

Assignment name:

 

24-STORIED JANATA BANK BUILDING AT MOTIJHEEL C/A, DHAKA

 

Funding agency: Janata Bank

 

Approx. value of the contract (in current US$):

 

US$ 264,200(DDC part)

Country: Bangladesh

 

Location within country: Motijheel Commercial Area, Dhaka

 

 

Duration of assignment (months): 119

Name of client:

 

Janata Bank

 

Total no. of person-months of the assignment: 540

Address:

 

110, Motijheel Commercial Area, Dhaka-1000

 

 

Approx. value of the services provided by the firm under the contract (in current US$):

 

US$ 264,200                

 

Start date (month/year): February, 1979

Completion date (month/year): December, 1988           

No. of professional person-months provided by the joint venture partners or the sub-consultants: 180

 

Name of joint venture partner or sub-consultants, if any:

 

Bangladesh Consultants Ltd. (JV Lead Partner)

Name of senior full time employees of the firm involved and functions performed:

 

Project Director: Syed Ijjad Ali, Project Engineer: K.K. Lodi, Chief Architect: Mahbubul Alam, Architect: Mustafizur Rahman, Air Conditioning & Lift Engineer: Abu Hossain Khan, Electrical Engineer: Harun-al-Rashid, Plumbing Engineer: K.M. Minnatullah, Structural Engineer: A.T.M. Kamal Hossain

 

Narrative description of project:

 

The project consists of a 24-storied high-rise building including one basement floor. Total floor area is 189,801 sft. with provision for central air-conditioning system (capacity 900 RT, sub-station 2500 KVA) and lift, fire-fighting system.

 

Description of actual services provided in the assignment:

 

–   Engineering survey

–   Sub-soil investigation

–   Preparation of master plan

–   Preliminary and final architectural design including structural, electrical, plumbing lift and air-conditioning design

–   Preparation of cost estimates and tender documents, bid evaluation and contract award

–   Construction supervision.

Assignment name:

 

24-STORIED JIBAN BIMA CORPORATION TOWER BLOCK AT MOTIJHEEL C/A, DHAKA

 

Funding agency: Government of Bangladesh

 

Approx. value of the contract (in current US$):

 

US$ 181,800(DDC part)

Country: Bangladesh

Location within country: Motijheel Commercial Area, Dhaka

 

Duration of assignment (months): 74

Name of client:

 

Jiban Bima Corporation

 

Total no. of person-months of the assignment: 114

Address:

 

Motijheel C/A, Dhaka

 

Approx. value of the services provided by the firm under the contract (in current US$):

 

US$ 181,800                

Start date (month/year): July, 1981

Completion date (month/year): August, 1987

No. of professional person-months provided by the joint venture partners or the sub-consultants: 06

 

Name of joint venture partner or sub-consultants, if any:

 

Steen Consultants, Singapore

Name of senior full time employees of the firm involved and functions performed:

 

Project Director: Badruddin Khan, Senior Structural Engineer: Syed Ijjad Ali, Senior Architect: Mominul Haq, Mid Level Engineer: Iftekhar Ahmed Khan, Structural Engineer: Dr. Golam Mostafa, Architect: Aftab Ahmed Pathan, Utility Engineer: Md. Salimuddin, Mechanical Engineer: A.B. Siddique, Electrical Engineer: Harun-al Rashid

 

Narrative description of project:

 

The project was to construct a 24-Storied Jiban Bima Corporation’s Office Building, with all modern facilities, like provision for central air-conditioning (capacity 400 RT), lift, fire fighting systems, sub-station (2000 KVA),emergency generator and car parking. The total floor area of the building was 178,351 sq. ft.

 

Description of actual services provided in the assignment:

 

–   Site survey and sub-soil investigation

–   Preparation of architectural plans, design and drawings

–   Preparation of structural design and drawings

–   Preparation of electrical, plumbing and sanitary design and drawings

–   Preparation of detailed design of fire fighting systems and other mechanical installation

–   Preparation of technical specification, cost estimate, tender documents and prequalification documents

–   Bid evaluation and award of contract

–   Construction supervision.

Assignment name:

 

CONSTRUCTION OF 20-STORIED NATIONAL SPORTS COUNCIL TOWER (NSC TOWER)

Funding agency: National Sports Council

Approx. value of the contract (in current US$):

 

US$ 125,870    

Country: Bangladesh

Location within country: 62/3, Purana Paltan, Dhaka

Duration of assignment (months): 33

Name of client:National Sports Council

Total no. of person-months of the assignment: 262

Address:

 

62/3, Purana Paltan, Dhaka

 

Approx. value of the services provided by the firm under the contract (in current US$):

 

US$ 125,870    

Start date (month/year): April, 2004

Completion date (month/year): December, 2006

No. of professional person-months provided by the joint venture partners or the sub-consultants: Nil

Name of joint venture partner or sub-consultants, if any:

 

None

Name of senior full time employees of the firm involved and functions performed:

 

Team Leader: AKM Nasiruddin, Geotechnical Specialist: Iftekhar Ahmed Khan, Sr. Architect: Ekramul Haque Khan, Architect:          Mahmud Hasan, Sr. Structural Engineer: Zayedur Rahim, Jr. Structural Engineer: Kishore Kumar Sikder, Environmental / Sr. Plumbing & Sanitary Engineer: AJM Alamgir, Jr. Plumbing & Sanitary Engineer: Shamsul Alam, Jr. Site Engineer (Plumbing & Sanitary): Sham Sundar Agarwala, Sr. Electrical Engineer: Afzal Ahmed, Jr. Electrical Engineer: Subodh Ch. Biswas, Sr. Mechanical Engineer: AB Siddique, Jr. Mechanical Engineer: Shamsul Hoque Foraji, Quantity Surveyor & Contract Doc. Engineer: Sarwar Alam, Sr. Site Engineer: Sayeduzzaman Mian, Material & QC Engineer: Abdul Matin, Jr. Site Engineer (Civil): Kazi Sirajul Islam, Jr. Site Engineer (Elect.): Md. Sujatul Islam

Narrative description of project:

 

National Sports Council Tower intends to construct a 20-storied building having two basementsand 13,000 sft. plinth area with auditorium, A/C, lift, sub-station, standby generator, car parking, fire fighting system, water, sanitary and gas connection system.

Description of actual services provided in the assignment:

 

–   Site survey and preparation of master plan;

–   Sub-soil investigation;

–   Preparation of architectural design and drawings;

–   Preparation of structural design and drawings;

–   Preparation of electrical system design and drawings including sub-station, standby generator, area and security lighting, fire-detection, alarm system, P.A. system, computer networking, auditorium lighting and sound system etc.;

–   Preparation of plumbing and sanitation design and drawings;

–   Preparation of fire-fighting system design and drawings;

–   Preparation of passenger lift design and drawings;

–   Preparation of air-conditioning system design and drawings;

–   Preparation of cost estimate, tender document, bid evaluation for structural, electrical, mechanical services;

–   Assisted National Sports Council in pre-qualifying contractors;

–   Assisted National Sports Council in pre-bid meetings and contract negotiations;

–   Preparation of award of contract;

–   Construction supervision and quality control during implementation;

–           Overall project management and monitoring.

Assignment name:

 

20-STORIED BASTRA BHABAN BUILDING AT KAWRAN BAZAR, DHAKA

 

Funding agency: Government of Bangladesh

 

Approx. value of the contract (in current US$):

 

US$ 78,125                  

 

Country: Bangladesh

 

Location within country: Kawran Bazar, Dhaka

 

Duration of assignment (months): 147

Name of client:

 

Bangladesh Textile Mills Corporation

 

Total no. of person-months of the assignment: 125

Address:

 

Bastra Bhaban, Kawran Bazar, Dhaka

Approx. value of the services provided by the firm under the contract (in current US$):

 

US$ 78,125                  

 

Start date (month/year): October, 1979

Completion date (month/year): December, 1991           

No. of professional person-months provided by the joint venture partners or the sub-consultants: Nil

 

Name of joint venture partner or sub-consultants, if any:

 

None

Name of senior full time employees of the firm involved and functions performed:

 

Project Director: Syed Ijjad Ali, Project Engineer: Humayun Kabir, Architect: Mustafizur Rahman, Structural Engineer: A.T.M. Kamal Hossain, Structural Engineer: Mahfuzul Mannan, Mechanical Engineer: Mujibur Rahman, Sanitary and Plumbing Engineer: K.M. Minnatullah, Electrical Engineer: Haroon-Al-Rashid

 

Narrative description of project:

 

The project comprises construction of 20-storied commercial office building having 18,000 sft. floor space in each floor, with basement floor for car parking.

 

Description of actual services provided in the assignment:

 

–   Survey of site, soil investigation and preparation of master plan

–   Preliminary and final architectural design and drawing

–   Structural design and drawings

–   Preparation of electrical and mechanical design and drawing including sanitary and water supply system

–   Preparation of cost estimate and tender document, bid evaluation and contract award

–   Construction supervision.

 

Assignment name:

CONSTRUCTION OF 15-STORIED OFFICE-CUM-COMMERCIAL BUILDING FOR THE INSTITUTION OF ENGINEERS, BANGLADESH

 

Funding agency: The Institution of Engineers, Bangladesh

 

Approx. value of the contract (in current US$):

 

US$ 86,200      

 

Country: Bangladesh

Location within country: IEB Head Quarter Premises, Ramna, Dhaka-1000

 

Duration of assignment (months): 66

Name of client:The Institution of Engineers, Bangladesh

 

Total no. of person-months of the assignment: 60

Address:

 

IEB Headquarter, Ramna, Dhaka-1000

 

Approx. value of the services provided by the firm under the contract (in current US$):

 

US$ 86,200      

 

Start date (month/year): February, 2002

Completion date (month/year): July, 2007

 

No. of professional person-months provided by the joint venture partners or the sub-consultants: Nil

Name of joint venture partner or sub-consultants, if any:

 

None

Name of senior full time employees of the firm involved and functions performed:

 

Team Leader: AKM Nasiruddin, Geotechnical Specialist: Iftekhar Ahmed Khan, Principal Architect: Aparesh Das / Mahmud Hasan, CAD Specialist: Shakila Parvin Khan, Sr. Structural Engineer: Abdur Rashid, Structural Engineer: Nurul Amin / Kishore Kumar Sikder, Site Engineer (Mech.): Shamsul Hoque Foraji, Site Engineer (Mech.): Kazi Jaynal Abedin, Sr. Water Supply & Sanitation Engineer: AJM Alamgir, Sr. Electrical Engineer: Md. Taslimuddin, Electrical Engineer: Sujatul Islam, Sr. Mechanical Engineer: AB Siddique, Sr. Air-conditioning, Lift, Fire Fighting Engineer: Sayedul Islam, Quantity Surveyor & Contract Documentation Engineer: Sarwar Alam, Resident Engineer: Sayeduzzaman Mian / Md. Atiqur Rahman

Narrative description of project:

 

Construction of 15-storeid Office-cum-Commercial Building at IEB Head Quarter premises, Ramna, Dhaka consisting of 22,000 sft. in each floor area on an average, two basement floor (for 200 car parking), air-conditioning, 2 nos. of 630 kg (8 persons) passenger lift, 1 no. 1,600 KVA sub-station, 1 no. 450 KVA stand-by generator, prayer room, cafeteria, car parking, fire fighting system, etc.

Description of actual services provided in the assignment:

–   Site survey and preparation of master plan;

–   Sub-soil investigation;

–   Preparation of architectural design and detailed drawings;

–   Preparation of structural design and drawings;

–   Preparation of electrical design and drawings;

–   Preparation of design and drawings for lift, split type air-condition;

–   Preparation of plumbing and sanitary design and drawings;

–   Preparation of cost estimate, tender document, bid evaluation and contract award;

–   Construction supervision (1st phase up to 8-storied); and

–           Overall project management and monitoring.

Assignment name:

 

CONSULTANCY SERVICES FOR CONSTRUCTION OF 3 BASEMENTS + 24-STORIED AUB BUILDING COMPLEX AT PLOT NO. E-18, AGARGAON, DHAKA

 

Funding agency: Association of Universities of Bangladesh (AUB)

 

Approx. value of the contract (in current US$):

 

US$ 661,110                   

Country: Bangladesh

Location within country: Agargaon, Dhaka

 

Duration of assignment (months): 56

Name of client:

 

Association of Universities of Bangladesh (AUB)

 

Total no. of person-months of the assignment:382

Address:

 

Masud Garden, House No. 22/16, Flat No. 7/C (Level‑7), Khiljee Road, Mohammadpur, Dhaka-1207

Approx. value of the services provided by the firm under the contract (in current US$):

 

US$ 165,280                

 

Start date (month/year): April, 2015

Completion date (month/year): November, 2019

No. of professional person-months provided by the joint venture partners or the sub-consultants:

 

9 persons – 339 mm

Name of joint venture partner or sub-consultants, if any:

 

MARC Architects & Engineers Ltd.(JV Partner)

Name of senior full time employees of the firm involved and functions performed:

 

Team Leader: AKM Nasiruddin, Architect: Md. Shah Alam, Contract Engineer: Sushil Kumar Saha, Environmental Engineer: Md. Golam Mustafa, PEng

 

Narrative description of project:

Association of University of Bangladesh intends to construct a new AUB Building Complex over a land area of 28,980 sft. (2693 MS) located at Agargaon, Dhaka.

The AUB complex will have a minimum floor space of the project: common facilities, ground floor to 2nd floor: 20,140 x 3 = 60,420 sft. 3rd floor to 23rd floor: Building-A: 158,400 sft. Building-B: 158,400 sft. Basement: 20,400 x 3 = 61,200 sft. Total area of the project: Building-A, Building-B and 3 Basement = 43,8420 sft. The major components of the proposed complex will have multistoried office buildings, landscaping, parking facilities and other electro-mechanical facilities including fire detection and fighting system, networking provisions for communication system (telephone, intercom, internet, etc), and interior designs of selected facilities.

Description of actual services provided in the assignment:

–  Site survey and investigation;

–  Preparation of architectural design;

–  Preparation of structural design;

–  Preparation of electrical and electro-mechanical designs;

–  Preparation of sanitary and plumbing designs;

–  Preparation of cost estimates and tender documents;

–  Preparation of construction documentation and working designs;

–  Preparation of bidding management;

–  Project management and monitoring; and

–  Construction supervision and defect liability.

Assignment name:

 

CONSULTANCY SERVICES FOR DETAILED STRUCTURAL, ELECTRO-MECHANICAL AND PLUMBING DESIGN, PREPARATION OF BOQ & TENDER DOCUMENT INCLUDING SUPERVISION FOR CONSTRUCTION OF MULTI-STORIED (32-STORIED) GREEN BUILDING AT RAJUK’S MOHAKHALI COMPOUND, DHAKA

 

Funding agency: Rajdhani Unnyan Kartripakkha (RAJUK)

Approx. value of the contract (in current US$):

 

US$ 964,945                   

Country: Bangladesh

Location within country: Mohakhali, Dhaka

 

Duration of assignment (months): 84

 

Name of client:

 

Rajdhani Unnyan Kartripakkha (RAJUK)

 

Total no. of person-months of the assignment: 532

Address:

 

RAJUK Annex Building (6th Floor),

Dilkusha Commercial Area,

Dhaka-1000

Approx. value of the services provided by the firm under the contract (in current US$):

 

US$ 964,945                    

Start date (month/year): August,  2015

Completion date (month/year): July,  2022

No. of professional person-months provided by the joint venture partners or the sub-consultants: Nil

 

Name of joint venture partner or sub-consultants, if any:

 

None

Name of senior full time employees of the firm involved and functions performed:

 

Team Leader: AKM Nasiruddin; Sr. Foundation Engineer: Md. Rezaul Karim; Sr. Structural Engineer: Md. Abdur Rashid, Peng; Sr. Electrical Engineer: Afzal Ahmed; Plumbing Engineer: A J M Alamgir; Structural Engineer: Mohammad Shams Ul Haque; Electrical Engineer: Subodh Chandra Biswas; Mechanical Engineer: Md. Akhtaruzzaman; Fire Fighting Engineer: Md. Abul Hossain; Building  Automation Expert: Rajib Hasan; Procurement / Contract Specialist: Md. Sarwar Alam; Site Engineer-1 (Civil): Mohammad Muraduddoula; Site Engineer-2 (Civil): Md. Rafiqul Islam; Site Engineer (Electrical): Imroze Ahmed; Site Engineer (Mechanical): Md. Shamsul Hoque Foraji

Narrative description of project:

 

The new RAJUK Head Office Building will be a 32-storied (94.49m height) one with 3-level basement and a maximum available office area (FAR 9.5) will be 8,64,275 sft. plus basement parking (204,696 sft.), a total of 10,68,971 sft. over a land area of 2.088 acre located at Mohakhali under Dhaka North City Corporation. Of the total floor area approximately 2,50,000 sft. office area will be occupied by RAJUK and the rest will be rented out. The major components of the proposed RAJUK head office building will have multistoried office building with parking facilities, landscaping, structures for sub-station, generator, STP, ETP, WTP; lifts, Solar/Renewable energy & system and other electro-mechanical facilities including fire detection and fighting system, building automation, interior designs of selected facilities, etc.

RAJUK Green office building will showcase their commitment to sustainability and cost-effectiveness. These will also effective for job responsibility of RAJUK, as general public who will visit the building will be highly very impressed with the innovative design and comfortable space. This project will be an exemplary one, which will be followed by our building industry as a model of “Green Building” later on. Various objectives have been set, which are described below:

•  This will be constructed as an energy-efficient building, which will explore all the techniques of renewable and recyclable energy like solar energy, water cycle, waste water treatment etc and use of durable and sustainable materials.

•  Maximum benefit from daylight will be used for interior spaces and naturally ventilated condition within the building will be considered, with limited air-conditioned space.

•  Design-decisions associated with this building will consider all the scopes of Bioclimatic and Passive Design options, applicable in the context of Dhaka.

•  Sustainable in its entire life cycle cost; in using construction material, transportation, construction method, maintenance and running the building.

•  Regional/Community design will be considered properly, along with the Ecology of the site.

•  Supreme importance will be given on the impact of the building on human performance. Along with creating a world-class sustainable building, the healthiest, most effective and comfortable work environment for the employees has to be designed.

•  As RAJUK is a service oriented organization, this office will act as a “Public Building”, with huge number of people visiting this office regularly. So, Public Spaces, Public Facilities will be designed and highlighted properly.

•  The compound will have the quality of a URBAN SPACE. Ancillary facilities and the commercial offices of this compound will attract lot of people in this compound. This space should be a breathing space for the surrounding area.

•  Nature’s elemental resources like open space, greenery, water and other natural textures are expected.

Description of actual services provided in the assignment:

 

Design Phase:

–  Site investigation;

–  Soil investigation;

–  Fixing of foundation and structural system;

–  Design and drawings of foundation of the building;

–  Preparation of structural, electrical, electro-mechanical, plumbing, fire fighting, building automation design and drawings;

–  Preparation of tender document.

Supervision Phase:

–  Full time construction supervision;

–  Submission of quarterly progress report;

–   Construction monitoring during 12 months defect maintenance period.

 

Assignment name:

 

DESIGN AND CONSTRUCTION SUPERVISION OF REMODELING AND REFURBISHMENT OF (2 NOS. 20-STORIED) ZONAL AND HEAD OFFICE BUILDINGS OF CWASA AT AGRABAD AND DAMPARA

 

Funding agency: World Bank

Approx. value of the contract (in current US$):

 

US$ 718,095                   

Country: Bangladesh

Location within country: Agrabad and Dampara, Chittagong

Duration of assignment (months): 36

Name of client:

Chittagong WASA

Total no. of person-months of the assignment:427

Address:

Ministry of LGRD & Cooperatives (Local Government Division) GoB, Parade Corner, Chwak Bazar, Chittagong

Approx. value of the services provided by the firm under the contract (in current US$):

 

US$ 718,095                

Start date (month/year): October, 2014

Completion date (month/year): September, 2017

No. of professional person-months provided by the joint venture partners or the sub-consultants: Nil

Name of joint venture partner or sub-consultants, if any:

 

None

Name of senior full time employees of the firm involved and functions performed:

Team Leader: AKM Nasiruddin, Deputy Team Leader: Md. Mustafizur Rahman, Architect: Md. Ekramul Haq Khan, Interior Designer: Md. Zahid Hassan, Structural Design Engineer Md. Shams Ul Haque, Electrical Engineer: Subodh Chandra Biswas, Civil Engineer: Md. Rafiqul Islam, BOQ Specialist: Md. Sarwar Alam, Structural Engineer, Junior Civil Engineer: 2 Nos., Junior Architect, CAD Operator: 2 Nos., Inspector: 2 Nos.

Narrative description of project:

Presently the CWASA head office is located in a five storied building at Dampara with a floor area of 890 sqm for each floor. But the entire floor space needs to be creatively reorganized and remodeled in order to accommodate different division and section offices and to improve staff working environment, interaction and productivity. MOD-2 zonal office is located behind the head office building in a dilapidated three storied building of 140 sqm area only, and the MOD-1 zonal office is tin shed roofing with brick wall building of only 279 sqm area located in Agrabad.

The objective of the consultancy is to develop working space in MOD-2 zonal office including CWASA head office at Dampara and MOD-1 zonal office at Agrabad with necessary remodeling, refurbishment, interior design and extension to accommodate all the zonal and main office activities of CWASA. The consultant will prepare detailed architectural, structural, sanitary and plumbing , electro-mechanical & interior design and drawings, cost estimate, bid document with tender assistance and full time supervision of the remodeling and refurbishment construction works.

Land Area: Total Land Area at Dampara: 1.37 Acres = 5574 sqm.; Space for Building Area: 2787 sqm.(approx); Total Land Area at Agrabad: 0.61Acres = 2476 sqm.; Space for Building Area: 1208 sqm. (approx)

Description of actual services provided in the assignment:

–    Conduct  detailed engineering and architectural survey of the existing buildings;

–    Conduct the detail sub-soil investigation;

–    Preparation of detail architectural drawing as per local by-law of BNBC (plans, elevations, sections, 3D-perspective views etc.) and structural design;

–    Preparation of detailed sanitary and plumbing design;

–    Preparation of electro-mechanical design and drawings including air conditioning (A/C) system, electric sub-station, Generator, and other related design;

–    Preparation of detailed cost estimate, preparation of BOQ and bid documents;

–    Preparation of technical specifications;

–    Preparation of detailed architectural and structural designs and drawings, cost estimates, bid documents;

–    Provide design of interiors of the building including furniture;

–    Preparation of detailed designs of the overall internal appearance of the building, including the reorganization of space and the schematic location of the furniture and accessories in the building (separate for each floor);

–    Preparation of detailed specification for all furniture and accessories;

–    Preparation of cost estimates;           

–    Preparation of pre-qualification evaluation reports;

–    Preparation of tender evaluation reports;

–    Preparation of contract documents;

–    Construction supervision; and

–    Construction monitoring during 12 months defect maintenance period.

Assignment name:

DESIGN AND SUPERVISION OF CONSTRUCTION OF BUILDINGS (12 NOS. 15-STORIED) AND RELEVANT RESETTLEMENT FACILITIES OF DHAKA ELEVATED EXPRESSWAY (DEE) PPP PROJECT

Funding agency: Government of Bangladesh

Approx. value of the contract (in current US$):

 

US$ 1,593,500              

 

Country: Bangladesh

Location within country: Digun, Bounia and Borokakar Mouza adjacent to Uttara RAJUK 3rd Phase

 

Duration of assignment (months): 36

Name of client:

 

Bangladesh Bridge Authority (BBA)

 

Total no. of person-months of the assignment:1013

Address:

 

Shetu Bhaban, New Airport Road, Banani, Dhaka-1212

 

Approx. value of the services provided by the firm under the contract (in current US$):

 

US$ 1,593,500               (Tk. 125,090,000)

 

Start date (month/year): November,  2015

Completion date (month/year): October,  2018

No. of professional person-months provided by the joint venture partners or the sub-consultants: Nil

 

Name of joint venture partner or sub-consultants, if any:

 

None

Name of senior full time employees of the firm involved and functions performed:

 

Team Leader: AKM Nasiruddin; Senior Architect: Md. Ekramul Huq Khan, Senior Structural Design Engineer: Mohammad Shams Ul Haque, Foundation Engineer (Design): Md. Abdur Rashid, PEng, ElectricalEngineer (Design): Subodh Chandra Biswas, Procurement Specialist: Md. Sarwar Alam, Resident Engineer: Sayeeduzzaman Mian

Narrative description of project:

 

Based on the resettlement study of Bangladesh Bridge Authority is going to build 12 nos. 15-storied (6 nos. building each floor area 1,000 sft. and another 6 nos. building each floor area 8,500 sft.) high-rise buildings and it requires consultancy services for the design and construction supervision of high-rise residential buildings including detailed drawing & design of architectural, structural, sanitary & plumbing, electrical, fire fighting, lift, air conditioning, sub-station etc. with preparation of total cost estimation & tender documents for the mentioned project at Digun, Bounia and Borokakar Mouza adjacent to Uttara RAJUK 3rd Phase. The land area of the proposed project is 40 acres (approximately 161,874 sqm).

Description of actual services provided in the assignment:

 

–    Site investigation;

•    Preparation of topography survey, master plan with landscaping; Environmental impact assessment & feasibility study; Site occupational health and safety; Site analysis; Land survey; and Sub-soil investigation

–    Preliminary design and documents

–    Design development documents

•    Preparation of final architectural drawings; Preparation of structural design and drawing; Preparation of sanitary/plumbing design and drawing; Preparation of electrical/mechanical design and drawing; Preparation of fire fighting and gas line design & drawing; and Preparation of lift design and drawing

–    Bill of quantities and cost estimate

•    Preparation of technical specification

–    Conditions of contract and bid documents

–    Project management and monitoring

•    Co-ordination with the client; Co-ordination with construction contractors; Contract evaluation and contract award

–    Fulltime Construction supervision and management

–    Preparation of reports

–    Supervision during maintenance period

Assignment name:

 

CONSULTANCY SERVICES FOR DESIGN AND SUPERVISION OF RHD HEADQUARTERS COMPLEX (13-STORIED)

 

Funding Agency: Government of Bangladesh

Approx. value of the contract (in current US$):

 

US$ 803,858                

Country: Bangladesh

Location within country: Tejgaon, Dhaka

Duration of assignment (months): 58

Name of client:Roads and Highways Department

Total no. of person-months of the assignment: 381

Address:

Sarak Bhaban, Tejgaon, Dhaka

Phone: 88-02-9879314

E-mail: acemsw@rhd.gov.bd

Approx. value of the services provided by the firm under the contract (in current US$):

 

US$ 442,120                

Start date (month/year): September, 2013

Completion date (month/year): Jun 2018

No. of professional person-months provided by the joint venture partners or the sub-consultants:

2 persons – 24 mm

Name of joint venture partner or sub-consultants, if any:

 

Vernacular

Name of senior full time employees of the firm involved and functions performed:

 

Senior Architect / Team Leader: Md. Ekramul Haque Khan, Sr. Structural  Engineer / Deputy Team Leader: Md. Abdur Rashid, Senior Electrical Engineer: Afzal Ahmed, Electrical Engineer: Subodh Chandra Biswas, Senior Mechanical Engineer: Md. Abul Hossain, Mechanical Engineer: Md. Akhtaruzzaman, Senior Sanitary & Plumbing Engineer: AJM Alamgir, Foundation Engineer: Jiban Krisna Paul, Structural Engineer: Md. Zayedur Rahim, Quantity Surveyor: Md. Taskinur Rahman, Junior Engineer: Md. Mahfuz Hossain Chowdhury, Environmental Expert-1, Landscape Architect-1, Network Specialist-1, Mid-Level Architect-3, Mid-Level Structural Engineer-3, Mid-Level Electrical Engineer-2, Mid-Level Mechanical Engineer-1, Mid-Level Sanitary and Plumbing Engineer-1, Civil Engineer: Sayeeduzzaman Mian, B.Sc. Engineer Civil (Supervision)-1, Diploma in Civil (Supervision)-2, Diploma in Electrical (Supervision)-1, Diploma in Mechanical (Supervision)-1

Narrative description of project:

The proposed RHD headquarters will have a minimum floor area of 1830,600 490 square meter (200328,000 square feet) over a land area of around 6.9 hectare (17.05 acre) located at Tejgaon under Dhaka North City Corporation. Total floor area of the building 31,250 sft. The major components of the proposed RHD headquarters complex will have multistoried office buildings, landscaping, parking facilities (around 1,860 square meter or 20,000 square feet), structures for welfare organizations of RHD officers and staff, mosque, cafeteria, lifts and other electro mechanical facilities including fire detection and fighting system, networking provisions for communication system (telephone, intercom, internet, etc.), interior designs of selected facilities.

Description of actual services provided in the assignment:

 

–   Land survey, site analysis and sub-soil investigation;

–   Preparation of a master plan for the proposed RHD headquarters complex;

–   Preparation of architectural design;

–   Preparation of structural design;

–   Preparation of electro-mechanical designs;

–   Preparation of sanitary and plumbing designs;

–   Preparation of bill of quantities including tender documents; and

–   Construction supervision.

Assignment name:

 

CONSULTANCY SERVICES FOR CONDUCTING FEASIBILITY STUDY, SURVEYING, PHYSICAL PLANNING, MODELING, DETAILED DESIGN, PREPARATION OF BID DOCUMENTS & CONSTRUCTION SUPERVISION ETC. FOR THE CONSTRUCTION OF FLYOVER AT KURIL INTERSECTION

 

Funding agency: Government of Bangladesh /Rajdhani Unnayan Kartripakkha (RAJUK)

 

Approx. value of the contract (in current US$):

 

US$ 777,340                

Country: Bangladesh

Location within country: Intersection at Kuril of Airport Road and Progati Sarani, Dhaka

 

Duration of assignment (months): 84

Name of client:

 

Rajdhani Unnayan Kartripakkha (RAJUK)

 

Total no. of person-months of the assignment: 327

Address:

 

RAJUK Bhaban, Dhaka-1000

Approx. value of the services provided by the firm under the contract (in current US$):

 

US$ 552,523                

 

Start date (month/year): April, 2007 (Feasibility Study, Preliminary & Detailed Design) and

April, 2010 (Supervision and Transfer of Knowledge)

Completion date (month/year): March, 2010 (Feasibility Study, Preliminary & Detailed Design) and March, 2014 (Supervision and Transfer of Knowledge)

 

No. of professional person-months provided by the joint venture partners or the sub-consultants: 44

 

 

Name of joint venture partner or sub-consultants, if any:

 

 

Acumen Consulting House (JV Partner)

Divine Associates Ltd. (JV Partner)

Name of senior full time employees of the firm involved and functions performed:

 

Deputy Team Leader: Md. Zakaria / Md. Zayedur Rahim, Structural Design Engineer: Harunur Rashid, Utility Engineer: Md. Asaduzzaman, Transport Planning Expert: ABM Siddique, Traffic Engineer: M. Shahjahan, Pavement / Highway Engineer: AKM Shamsul Huda, Geotechnical / Foundation Engineer: Mesbahuddin Ahmed, Survey Expert: Khili Mong, Electrical Engineer: Afzal Ahmed, Mechanical Engineer: Abu Bakr Siddique, Quality Control / Material Engineer: Md. Abdul Mannan / Md. Abdul Mazid, Statistical / Financial / Economical Analyst: Dr. AKM Ghulam Rabbani, Environmental Expert: AJM Alamgir, Architect: Dr. Rashidul Hasan Khan, Procurement / Contract Specialist: Abdul Awal, Quantity Engineer: Md. Jahangir Alam, Resident Engineer: Abu Bakr Siddique / Atul Krishna Datta, Supervision Engineer (Civil)-1: Sarker Md. Shajahan Ali, Supervision Engineer (Civil)-2: Abdul Hannan, Supervision Engineer (Electrical): M.A. Matin, Supervision Engineer (Mechanical): K.M. Idrisur Rahman

 

Narrative description of project:

 

The intersection at Kuril of Airport Road and Progati Sarani, in close proximity of a dual track mainline railway crossing on Progati Sarani, is already a congested junction. Rajdhani Unnayan Kartripakkha (RAJUK) is developing a new 300 ft wide link road to serve as access to its new township called Purbachal. The link road is planned to connect to the Progati Sarani / Airport Road in close proximity of this intersection. With the commissioning of this link road, Kuril intersection is likely to become unacceptable congested unless a planned arrangement of traffic segregation and railway separation is implemented. RAJUK therefore plans to construct a flyover, which is likely to be a multilevel intersection, to ensure smooth flow of traffic through this junction. The length of the bridge is 3,000 m.

Description of actual services provided in the assignment:

Phase I: Feasibility Study and Preliminary Design

  • Traffic Study and Forecast, • Topographic and Existing Utility Services Survey, • Climatology, Geology, Seismicity and Geotechnical Considerations, • Consideration of Construction Materials, • Physical Planning, • Design Criteria and Preliminary Design, • Preliminary Cost Estimate, • Techno-Economic Analysis, • Socio-Economic Condition Study, • Environmental Studies: – Environmental Impact Assessment (EIA), – Environmental Management Plan (EMP), • Feasibility and Preliminary Design Report.

Phase II: Detailed Engineering Design, Physical Modelling, Cost Estimation and Preparation of Tender Documents

  • Soil and Sub-Surface Investigation, • Materials Investigation, • Fixation of Flyover and Approach Alignment, • Relocation of Utilities, • Diversion Plan, • Land Requirement, • Detailed Design, Drawing and Calculations, • Physical Model, • Project Implementation Plan, • Final Cost Estimate and Bill of Quantities: – Estimation of Quantities, – Cost Estimate, • Preparation of Tender Documents, • Pre-qualification of Contractors, • Final Design Report.

Phase III: Supervision of Construction

  • Assisting RAJUK Authority in Tendering Process, • Project Management, • Training of RAJUK Officials in Management, Construction and Quality Control of Flyover Construction, • Construction Supervision, • Quality Control, • Final Handover of the Flyover to RAJUK.

Transfer of Knowledge

• Workshop W1: Feasibility Study Report and Preliminary Deign of Kuril Flyover, • Workshop W2: Final Design of Kuril Flyover, • Training Programme T1: Flyover Design, • Training Programme T2: Flyover Construction, • Overseas Training Programme for RAJUK Officials.

Assignment Name:

 

CONSTRUCTION OF FLYOVER AT MURADPUR, 2 NO. GATE & GEC JUNCTION, CHITTAGONG

 

Funding agency: Government of Bangladesh

Approx. value of the contract (in current US$):

 

US$ 678,228    

 

Country: Bangladesh

Location within country: Muradpur 2 No. Gate, GEC Junction & WASA More, Chittagong

Duration of assignment (months): 78

Name of client:

 

Chittagong Development Authority (CDA)

 

Total no. of person-months of the assignment: 240

Address:

 

CDA Building, Court Road, Chittagong

 

Approx. value of the services provided by the firm under the contract (in current US$):

 

US$ 271,291                

 

Start date (month/year): January, 2011

Completion date (month/year): June, 2017

·         No. of professional person-months provided by the joint venture partners or the sub-consultants: 121.5

Name of joint venture partner or sub-consultants, if any:

 

SARM Associates Limited (JV Partner)

Design Planning & Management Consultants Ltd. (JV Partner).

Name of senior full time employees of the firm involved and functions performed:

 

Team Leader: Md. Zakaria, Structural Engineer-1: M. Tahsin Uddin Ahmed / Mahadeb Kumar Kundu, Structural Engineer-2:  Md. Tazuddin, Geo-tech / Foundation Design Engineer: A.K.M. Shamsul Huda, Survey Expert: AFM Imdad Rasul, Electrical Engineer: Afzal Ahmed, Mechanical Engineer: Abu Bakr Siddique, Quality Control Engineer-1: Md. Emdad Hossain / Mohammad Muraduddoula, Architect: Shakila Parveen Khan, Supervision Engineer: Mozammel Hossain, Resident Engineer-2: Md. Sadaque Hssain, Supervision Engineer-3: Md. Sharegul Alam, Transport Economist: Syed Faizul Islam

 

Narrative description of project:

Chittagong, the port city of Bangladesh, is the 2nd largest city of the country with an estimated population of over 4 million, which is increasing every year. Being a port city, Chittagong is facing tremendous pressure on its communication system as both the foreign and domestic freights are transported through this port as well as the Central Business District. Muradpur and GEC Junction are situated in the heart of the city and is one of the busiest intersections of the city which is facing extreme traffic jam every day. To ease the situation, Chittagong Development Authority (CDA) has decided to construct a flyover from Muradpur 2 No. Gate to GEC Junction.

·         The consultancy services included design of 3.6 km long pre-stressed girder flyover with 94 nos. of spans; span length 30.0-45.0 m. This also included design of 150.0 m viaducts at each end with 4 ramps throughout the length of flyover.

Description of actual services provided in the assignment:

–   Feasibility study;

–   Traffic survey, topographic survey, axle load survey;

–   Sub-soil investigation;

–   Preparationof detailed architectural and structural design and drawings;

–   Preparationof detailed cost estimate and bill of quantity;

–   Environmental impact study;

–   Preparation of animation and 3-D multimedia presentation;

–   Preparation of tender documents including technical specifications;

–   Full time construction supervision;

–   Preparation of reports etc

 

Assignment name:

 

CONSTRUCTION OF OVER BRIDGE AT DEWANHAT JUNCTION, CHITTAGONG UNDER WIDENING AND IMPROVEMENT OF DHAKA TRANK ROAD

 

Funding agency: Government of Bangladesh

Approx. value of the contract (in current US$):

 

US$ 62,500

Country: Bangladesh

Location within country: Dewanhat Junction, Chittagong

 

Duration of assignment (months): 25

Name of client:

 

Chittagong Development Authority (CDA)

 

Total no. of person-months of the assignment: 78.5

Address:

 

CDA Building, Court Road, Chittagong

Approx. value of the services provided by the firm under the contract (in current US$):

 

US$ 62,500

 

Start date (month/year): January, 2012

Completion date (month/year): January, 2014

No. of professional person-months provided by the joint venture partners or the sub-consultants: Nil

 

Name of joint venture partner or sub-consultants, if any:

 

None

Name of senior full time employees of the firm involved and functions performed:

 

Team Leader: Moizuddin Ahmed Jaigirdar, Sr. Structural Engineer / Bridge Design Engineer: Md. Serajul Islam, Structural Bridge Engineer: Harunur Rashid, Geo-technical / Foundation Design Engineer: AKM Shamsul Huda, Survey Engineer: AFM Imdad Rasul, Electrical Engineer: Afzal Ahmed, Mechanical Engineer: Md. Abul Hossain, Quality Control Engineer: Md. Emdad Hossain, Architect: Shakila Perveen Khan, Resident Engineer: Mrittunjoy Ghosh / Md. Sadaque Hossain, Supervision Engineer-1: ATM Shafiul Alam, Supervision Engineer-2: Md. Sheragul Alajm, Transport Economist: Md. Abul Keshem

 

Narrative description of project:

The project is basically a 2-lane Railway Overpass which will be constructed at Dewanhat Junction, north-south part of which connects Sk. Mujib Road (Tiger Pass to Agrabad) and west-east part connects Dhaka Trunk Road (Alankar to Kadamtoli junction). There is no direct traffic movement across this junction from Alankar to Kadamtoli Junction. In order to reduce traffic jam and to move traffic freely from Tiger Pass to Agrabad Commercial Area and to create a direct communication linkage, it is evident that there is no other alternative but to construct an Overpass at this junction. It will have a positive impact on environment, economic and social aspects of the Metropolitan Port City. Length of overpass is 550mapproximately.

Description of actual services provided in the assignment:

–   Conduct feasibility study;

–   Conduct traffic survey, topographic survey, axle load survey;

–   Conduct sub-soil investigation;

–   Prepare detailed architectural and structural design and drawings;

–   Prepare detailed cost estimate;

–   Conduct environmental impact study;

–   Prepare animation and 3-D multimedia presentation;

–   Prepare tender documents including technical specifications;

–   Conduct full time construction supervision;

–   Prepare reports etc.

Assignment name:

 

FEASIBILITY STUDY OF DHAKA ELEVATED EXPRESSWAY

 

Funding agency: Italian-Thai Development Public Company Ltd.

 

Approx. value of the contract (in current US$):

 

US$ 137,130                

Country: Bangladesh

Location within country: Different locations in Dhaka city (From Airport to Chittagong road)

 

Duration of assignment (months): 03

Name of client:

 

Italian-Thai Development Public Company Ltd.

 

Total no. of person-months of the assignment: 08

Address:

 

2034/132-161 Italthai Tower, New Petchburi Road, Bangkapi, Huaykwang, Bangkok 10320, Thailand.

Tel. (66 2) 716-1600, Fax. (66 2) 716-1488

 

Approx. value of the services provided by the firm under the contract (in current US$):

 

US$ 137,130                

Start date (month/year): September, 2010

Completion date (month/year): November, 2010

No. of professional person-months provided by the joint venture partners or the sub-consultants: Nil

 

Name of joint venture partner or sub-consultants, if any:

 

None

Name of senior full time employees of the firm involved and functions performed:

 

Team Leader / Transport Planner: Mahbubur Rahman, Transportation Engineer: Ms Jobaida Nahar, Geotechnical Engineer: Joglul Hossain, GPS Survey Specialist: Md. Nasim Haider, Enumerators: 200

 

Narrative description of project:

 

The route of the present Dhaka Elevated Expressway shall commence at Shahjalal International Airport and run alongside New Airport Road, along the rail alignment through the Mohakhali, Tejgaon and Moghbazar to Kamalapur rail station and then the Expressway shall pass through Golapbag south of the Kamalapur Stadium, east of Jatrabari and connect to Dhaka-Chittagong Highway near Kutubkhali. It will have 2 elevated links, 7 interchanges and 35 ramps. Total length of Elevated Expressway 21.2 km.

The works involved conducting survey works as required for feasibility study of proposed Dhaka Elevated Expressway on PPP basis.

 

Description of actual services provided in the assignment:

 

The following services were provided by the Consultant:

–   Topographic and utility survey;

–   Soil investigation at 21 locations;

–   Traffic survey and analysis at 4 locations and 44 road intersections;

–   Preparation of reports and documents.

Assignment name:

 

ASSISTANCE TO THE JATRABARI-GULISTAN FLYOVER PROJECT UNDER BOOT BY PRIVATE INVESTMENT: CONSULTANCY SERVICES FOR DESIGN REVIEW / FINALIZATION

Funding agency: Govt. of Bangladesh/Dhaka City Corporation

Approx. value of the contract (in current US$):

 

US$ 451,243    

Country: Bangladesh

Location within country: Dhaka Metropolitan City

Duration of assignment (months): 12

Name of client:

Dhaka City Corporation (DCC)

Total no. of person-months of the assignment: 73

Address:

Nagar Bhaban, Dhaka-1000, Bangladesh

 

Approx. value of the services provided by the firm under the contract (in current US$):

US$ 112,814                

Start date (month/year): March 15, 2006

Completion date (month/year): February 15, 2007

No. of professional person-months provided by the joint venture partners or the sub-consultants: 50

Name of joint venture partner or sub-consultants, if any:

Consulting Engineering Services (India) Pvt. Ltd.(Lead JV Partner)

DEVCONsultants Ltd., Bangladesh

Desh Upodesh Ltd., Bangladesh

Name of senior full time employees of the firm involved and functions performed:

Design Engineer-1: Md. Zakaria, Foundation Engineer: ABM Mofidul Islam, Environmentalist: AJM Alamgir,  Contract Specialist: ABM Abul Kabir, Mechanical Engineer: Abu Bakr Siddique, Electrical Engineer: Md. Sujatul Islam, Architect: Kamal Uddin Faruque

Narrative description of project:

The proposed flyover project has been taken up by Dhaka City Corporation under Build-Own-Operate-Transfer (BOOT) basis. The design is being carried out by the concessionaire. Dhaka City Corporation has appointed the consultants for review of the detailed design being developed by the concessionaire.

The flyover project comprises a main flyover having four-lane divided carriageway which extends about 3.4 km from Gulistan to Jatrabari in the capital city of Dhaka. There are a number of existing roads which connect the main road between Gulistan and Jatrabari. Access has been provided to the main flyover from/to many of these roads by means of one-way intermediate-lane (6m clear carriageway width) ramps. Thirteen such ramps have been planned. The ramps also have suspended spans. The total length of the main flyover and the ramps taken together is about 9 km.

1500 mm diameter reinforced concrete cast-in-situ pile foundation (drilled shaft) has been provided for main flyover and 1200 mm diameter piles for ramps. Reinforced concrete rectangular piers are used in main flyover and ramps. The superstructure for the main flyover has been planned as 3 to 4 span continuous pre-cast segmental post-tensioned structure (span range 24m to 38m). The pre-stressed concrete cast-in-situ 3 to 4 span continuous superstructures have proposed for the ramps.

Description of actual services provided in the assignment:

–   Detailed review and finalization of design, drawings including specifications prepared by the concessionaire.

–  Assisting PMU to DCC in finalization of design, methodology, implementation program and other related issues as required including monitoring the implementation of the land acquisition plan.

–   Assisting PMU, DMP in traffic management/diversion plan for the construction sites.

–   Review the work program, method statement, material sources etc. proposed by the concessionaire.

–   Review and assist in the finalization of Environmental Management Plan (EMP) and assisting DCC in implementation of EMP.

–   Review the Resettlement Action Plan (RAP) and assist DCC in its implementation.

–   Providing technical support to DCC for maintenance and operation of the flyover including assessing training needs and preparing training plans institutional development. Also conducting training program for DCC personnel for developing their management and technical skills.

–           Assisting PD/DCC in preparation of monthly progress reports and other reports as applicable.

Assignment name:

 

SUPERVISION, MONITORING AND MANAGEMENT OF JATRABARI-GULISTAN FLYOVER

 

Funding agency: Govt. of Bangladesh / Dhaka South City Corporation

Approx. value of the contract (in current US$):

 

US$ 886,885                

Country: Bangladesh

Location within country: Dhaka Metropolitan City

Duration of assignment (months): 37

Name of clientDhaka City Corporation (Dhaka South City Corporation (DSCC)),

Total no. of person-months of the assignment: 258

Address:

 

Nagar Bhaban, 5, Phoenix Road, Fulbaria, Dhaka‑1000, Bangladesh

Approx. value of the services provided by the firm under the contract (in current US$):

 

US$ 270,160                

Start date (month/year): July, 2011

Completion date (month/year): July, 2014

No. of professional person-months provided by the joint venture partners or the sub-consultants: 46

Name of joint venture partner or sub-consultants, if any:

 

Consulting Engineering Services (India) Pvt. Ltd.(Lead JV Partner)

Name of senior full time employees of the firm involved and functions performed:

 

Design Engineer-1: Moizuddin Ahmed Jaigirdar / Sabuj Baran Dutta, Design Engineer-2: Harunur Rashid / Md. Rezaul Karim, Resident Engineer: Md. Monzurul Islam, Material and Quality Control Engineer-1: Syed Golam Mowla, Material and Quality Control Engineer-2: Md. Korban Ali, Foundation Engineer: ABM Mofidul Islam, Drainage Engineer: Md. Asaduzzaman, Traffic Engineer: Shishir Kumar Shil, Electro-Mechanical Engineer: K.M. Idrisur Rahman, Junior Supervision Engineer-1: Ashim Kumar Datta / ATM Shafiul Alam, Junior Supervision Engineer-2: Md. Helal Uddin / Md. Rashel Mahmud, Enforcement Specialist: Ahmed Fazlul Kabir, Institutional Development Specialist / Training Specialist: A.B.M. Siddique, Quantity Engineer: AFM Imdad Rasul, Enforcement Specialist: P.K. Chanda

Narrative description of project:

General: The Government of Bangladesh is desirous of upgrading and expanding the transport network of Dhaka for the benefit of the users to reduce traffic congestion of the southern part of Dhaka city and to improve faster road connectivity with 34 districts as the major gateway of the capital thereof and the larger economic development of the country and in pursuance of that objective, has decided to construct Mayor Mohammad Hanif Flyover approximately 11,800m in length with ramps and related infrastructures with a four lane divided carriageway, on Build-Own-Operate and Transfer (BOOT) basis under aegis of Dhaka South City Corporation.

Project Location: The project location is a section under the area of Dhaka South City Corporation. The flyover starts from Palasi, aligns along the roadway of the Zahir Raihan Sharani towards south-east direction, connecting Nawabpur road, DIT Avenue, Hatkhola road, Syedabad bus terminal, Autish-Dipankar road and Jatrabari intersection connecting Dhaka-Narayanganj road, Demra road, and ends of Dhania on Chittagong road.

Details of Flyover: (i) Total length including ramps 11,800m, clear  height 5.5m; (ii) 11 ramps (5 entry ramps, 6 exit ramps) to connect with existing road network & bus terminal (as per revised layout); (iii) Precast pre-stress segmental box type superstructure; and (iv) 4 lane divided carriageway for movement of traffic in both the directions; Minimum clear height along the carriageway under the flyover will be 5.5m in accordance with the AASHTO, IRC and 7.2m at level crossing in accordance with Bangladesh Railway.

Design Consideration: State-of-the-art design based on latest American code AASHTO LRFD; Optimizing highway alignment to avoid land acquisition; Smooth transaction curve for comfort and safe traffic movement; Adequate merging and de-merging lane for safe and least disruption on traffic flow; Unique 4-span (150m) continuous modules for better riding quality; Pre-cast concrete twin-cell segmental box girder for faster and safe construction in urban area; and Overall aesthetics given preference in design.

Design Consideration: State-of-the-art design based on latest American code AASHTO LRFD; Optimizing highway alignment to avoid land acquisition; Smooth transaction curve for comfort and safe traffic movement; Adequate merging and de-merging lane for safe and least disruption on traffic flow; Unique 4-span (150m) continuous modules for better riding quality; Pre-cast concrete twin-cell segmental box girder for faster and safe construction in urban area; and Overall aesthetics given preference in design.

Description of actual services provided in the assignment:

–   Construction supervision and monitoring;

–   Implementation of traffic management plan; and

–           Capacity building for DSCC in the field of supervision, post implementation monitoring and management of flyover.

Assignment name:

 

CONSULTANCY SERVICES FOR SASEC ROAD CONNECTIVITY PROJECT (P40540-BAN/Loan 2949-BAN) [ADB 2016 Best Project Team Award]

 

Funding agency:Asian Development Bank, OPEC, Government of Abu Dhabi, and Government of Bangladesh

Approx. value of the contract (in current US$):

 

US$ 12,743,307            

 

Country: Bangladesh

 

Location within country: (a) Joydevpur-Chandra-Tangail Road (4-laning of about 70 km), (b) Tejgaon I/A, Dhaka (RHD HQ office building, (c) Benapole and Burimari (2 land ports improvement)

Duration of assignment (months): 53

Name of client:

Roads and Highways Department, Ministry of Communications, Govt. of Bangladesh

 

Total no. of person-months of the assignment: 2644

Address:

132/4, New Bailey Road, Dhaka-1000

132/4, New Bailey Road, Dhaka-1000

Tel: +8802 833 3570Fax: +8802 934 3079

E-mail:pdadbp@rhd.gov.bd or deleepgt@gmail.com

 

Approx. value of the services provided by the firm under the contract (in current US$):

 

US$ 3,860,145              

 

Start date (month/year): February, 2014

Completion date (month/year): June, 2018

No. of professional person-months provided by the joint venture partners or the sub-consultants:

233

Name of joint venture partner or sub-consultants, if any:

 

Kunhwa Engineering & Consulting Co., Ltd., South Korea (Lead JVPartner); Korea Consultants International Co., Ltd., South Korea (JV Partner); Intercontinental Consultants and Technocrats Pvt. Ltd., India (JV Partner)

Name of senior full time employees of the firm involved and functions performed:

 

Deputy Team Leader / Highway Engineer: Abdul Matin Choudhury / Shuja Ahmad Saadullah, Pavement Engineer: AFM Hamidul Haque, Highway Engineer: AKM Shamsul Huda / Md. Rafiqul Islam, Structural (Bridge) Engineer: Sabuj Baran Dutta, Resident Engineer-1: Abu Bakr Siddique, Resident Engineer-2: Atul Krishna Dutta, Resident Engineer-3: Md. Rafiqul Islam, Resident Engineer-4: Sarker Md. Shahjahan Ali, Resident Engineer-5: Syed Ghulam Mowla, Material and Pavement Engineer-1: Md. Abdul Mozid, Material and Pavement Engineer-2: Md. Emdad Hossain, Material and Pavement Engineer-3: Md. Sadaque Hossain, Material and Pavement Engineer-4: Md. Imarat Hossain, Material and Pavement Engineer-5: Md. Shah Alam Talukder, Quantity Surveyor-1: Palash Chandra Pramanik, Quantity Surveyor-2: Md. Sharegul Alam, Quantity Surveyor-3: Kazi Sirajul Islam, Quantity Surveyor-4: Kh. Abu Sayed, Quantity Surveyor-5: Md. Rezaul Karim, Road Safety Engineer-1: Biplab Kumar Howlader, Road Safety Engineer-2: Shishir Kumar Shil, Environment Specialist: AJM Alamgir, Resettlement Specialist: M. Faridul Islam / Sitangshu Bikash Saha, Topographic Surveyors: 05 Nos., Jr. Site Engineers: 05 Nos., Architect: Md. Shah Alam, Electrical Engineer: Md. Amjad Hossain, Mechanical Engineer: Md. Abul Hossain, Civil/Drainage Engineer: Md. Sohel Rana, Work Supervisors: 15 Nos., CAD Technicians: 05 Nos., Lab Technicians: 05 Nos., Asstt. Lab Technicians: 10 Nos.

Narrative description of project:

The Project Implementation Consultants (PIC) to assist the Roads and Highways Department (RHD) and Bangladesh Land Port Authority (BLPA)  to implement the Project with the following tasks:

Task 1.For LPA, prepare detailed design and provide procurement support for the project, covering (i) construction of transshipment shed, (ii) repaving and drainage system, and (iii) development of pilot warehouse in Banapole and Burimari land ports.

Task 2. For both RHD and BLPA, undertake construction supervision for the project, covering (i) about 70km of JCT (Joydevpur-Chandra-Tangail) road and the RHD Office Building (RHD), and (ii) Benapole and Burimari Land Ports (BLPA).

The objective of the construction supervision for RHD and BLPA includes:

(i)   Ensure high standards of quality assurance in the execution of work and completion of work within stipulated time limit;

(ii)   Comprehensive  supervision of project implementation activities carried out by the Contractor(s) to ensure complete  compliance  with the drawings, technical specifications and various stipulations contained in the Contract Documents; and

(iii)  Efficient construction supervision by personnel who are experienced in modern methods of construction supervision and contract management.

Task 3. For RHD, undertake a third-party maintenance quality checks for about 500km of selected roads under maintenance. The objective of the third-party quality check is to undertake quality check on the works carried out by the contractor, with regard to the technical, contractual and financial aspects of the project implementation. The consultant shall provide to the RHD, the GoB and the ADB, and assessment report on the quality of the completed maintenance works.

Structural works under this project are as follows:

i)       Flyover                           :    06 Nos.  –  length    3,171 m

ii)       PC Girder Bridge            :    19 Nos.  –  length    1,222 m

iii)      RCC Bridge                    :    07 Nos.  –  length       216 m

iv)      RC Box Culvert               :    58 Nos.  –  length       374 m

v)      Pedestrian Overpass       :    12 Nos.  –  length       419 m

                                         Total 102 Nos., Total length5,402 m

Cast-in-Situ Piles: 2.692 Nos., Pile Dia: 1000 mm and Length: 25.00 m to 40.00 m. Total Pile Length: 79,160 m

Girders: (i) PC Girder: 862 Nos. (ii) RCC Girder: 90 Nos. Total Girder = 952 Nos.

Benapole and Burimari Land Ports:

a)      Benapole Land Port:

i)       New Warehouse: 2 nos., Area: 3,764 sqm.

ii)       RCC Warehouse Paving: 12 nos., Area: 16,270 sqm.

iii)      Transshipment Shed: 4 nos., Area: 5,745 sqm

iv)      RCC Road Paving: 86,800 sqm.

v)      Surface Drain: 7,900m

vi)      Electrical works.

b)      Burimari Land Port:

i)       Transshipment Shed: 2 nos., Sizes: 62m x15m & 65m x 15m

ii)       Concrete Paving of Sheds: 62m x 15m & 65m x 15m

iii)      RCC Culvert: Size 9.80m x 5.30m

iv)      RCC Surface Drain: 1,800m

v)      Concrete Paving Road: 3,500 sqm.

vi)      Electrical works.

c)      RHD HQ Office Building:

i)       Land area of around 6.9 hectare (17.05 acre) located at Tejgaon I/A, Dhaka

Additional structures (with additional lone from ADB):

i)       Flyover: 06 nos. at Naojuri, Shafipur, Kaliakoir ICT Park, Gorai Bazar, Chandra Loop and Rabna.

ii)       Underpass: 07 nos. at Kaliakoir, Mirzapur, Pakulla, Garinda.

iii)      SMVT Bridge: 03 nos. at Kodda-1, Kodda-2 & Bymail

iv)      RCC Culver: 17 nos. at different locations between Ch. 00.00 to Ch. Km. 36+900

Description of actual services provided in the assignment:

 

Task 1. Detailed design and procurement support for LPA

–    Detailed design

–    Procurement support

Task 2. Construction supervision for RHD and LPA

–    4-laning of about 70 km (Joydevpur-Chandra-Tangail Road) of RHD

–    RHD office building

–    2 land ports improvement (Benapole and Burimari) of LPA

Task 3. Third-party maintenance quality check for RHD.

Assignment name:

 

TELECOMMUNICATION NETWORK DEVELOPMENT PROJECT (TNDP) OF BTCL UNDER JICA ODA LOAN AGREEMENT NO. BD-P53

 

Funding agency: JICA ODA

Approx. value of the contract (in current US$):

 

US$ 3,025,460                 

Country: Bangladesh

Location within country: BTCL’s sites around the whole country of Bangladesh

Duration of assignment (months): 68

Name of client:

 

Bangladesh Telecommunications Company Limited

Total no. of person-months of the assignment: 480

Address:

 

Telephone Revenue Bhaban (5th Floor), Sher-e-Bangla Nagar, Dhaka-1207

Approx. value of the services provided by the firm under the contract (in current US$):

 

US$ 1,073,080                 

Start date (month/year): November, 2010

Completion date (month/year): June, 2016

No. of professional person-months provided by the joint venture partners or the sub-consultants:

Foreign: 126

ECAL: 141

Name of joint venture partner or sub-consultants, if any:

 

IS International, Inc., Tokyo, Japan (Lead Partner); Japan Telecommunications Engineering and Consulting Services, Tokyo, Japan; Engineering Consultants & Associates Ltd., Bangladesh

Name of senior full time employees of the firm involved and functions performed:

 

Afzal Ahmed: Project Manager (Local), Abdur Rouf: Senior Consultants, Md. Fazlur Rahman: Senior Consultants, Md. Sarwarul Alam: Tender Consultant, S.H. Foraji: Junior Consultant, Subodh Ch. Biswas: Junior Consultant, Syed Maiedul Hoque: Junior Consultant, Md. Amjad Hossain: Junior Consultant, Imroj Ahmed: Junior Consultant

Narrative description of project:

In order to improve the existing telecommunication services of Bangladesh, in terms of quantity as well as quality, thereby contributing to the development of the private sector and the country’s the following objectives of the project are:

 

To increase, in line with guidelines of Bangladesh’s International Long Distance Telecommunications Services (ILDTS) Policy 2007, the interconnection capacity of BTCL’s ANS (Access Network Services) network with different newly licensed ICX (Interconnection Exchange) Service providers.

 

BTCL’s ICX Network with different ANS (Fixed, Mobile and WLL) operators’ network and newly licensed IGW (International Gateway) service providers

 

–   To increase the capacity of International Gateway (IGW) Exchange(s)

–   To install/increase the capacity of Pol (Point of Inter-connections) in five major cities of the country

–   To install Optical Fiber Cable Network around the country and to rehabilitate existing terrestrial microwave links to improve the existing capacity & capability of BTCL’s network.

–   To install/increase the capacity of broadband network, including FTTB/ FTTH (Fiber to the Building Home) and xDSL/ADSL (Asynchronous Digital Subscriber Line) system, in major cities and their surrounding areas.

–   To introduce NGN (Next Generation Network) and IP (Internet Protocol) capability in BTCL’s network.

–   To introduce Wireless Access [by CDMA WLL (Code Division Multiple Access Wireless Local Loop) and WiMAX or World wide Interoperability for Microwave Access] capability in BTCL’s network.

–   To increase the capacity of BTCL’s In (Intelligent Network) for enabling introduction of new VAS (Value Added System)

–   To install a 24x 7 NOC (Network Operation Centre) for BTCL’s network

–   To install Computerized Accounting System for BTCL.

 

The consultant shall submit the following reports and documents to BTCL authorized personnel:

 

a. Inception report’s, Site inspection and survey report; b. Master plan for BTCL for next 10 years; c. Quarterly progress report; d. Final report for each project component; e. Verifications of as built drawing; f. and any report required for the project & BTCL.

Description of actual services provided in the assignment:

Detail scope of consulting services and scope of works divided in two components: (a) Engineering services (b) Details of other implementation services.

 

a. Engineering Services:

Details of engineering services are described below, and the time and job staggering of consultant manpower for engineering services shall have three (3) distinct phases:

Phase 1: Detail Design Phase

–     Field Survey: Review of previous studies including SAPROF and appraisal documents

–     Basic and Detail Design: Technical and financial feasibility study on other alternate methods and cost reduction by fulfilling desired quality of services

–     Plan optimum systems and network design as per current requirements of BTCL

–     Breakdown different project components in to practical tender components

–     Cost estimation for different component

–     Preparation of pre-qualification and tender documents including technical specifications, training programs, evaluation criteria draft contract templates and commercial documents  in collaboration with BTCL

–     Submission of soft copy and required number of hard copies (as indented by the project office of BTCL)

–     Attendance of pre-bid meetings

–     Reply to bid enquires

–     Corrections (if necessary) of tender documents as per results of pre-bid meeting (s) and/ or any change initiated by BTCL/consultant.

Phase 2: Evaluation and Contract Phase

Assist BTCL Evaluation teams for preparation of Evaluation Reports of different bids of tenderers including followings:

 

–     Assist BTCL in preparation of answers to subsequent queries

–     Assist: BTCL in ascertaining bidder(s) compliance to various clauses and sub-clauses of tender documents

–     Assist BTCL to ascertain  capabilities of different bidder(S) to turn-key completion of all  works related to the relevant tender

–     Assist BTCL to ascertain the exactness of the BOQ submitted by the bidder(s) relevant to tender

–     Prepare list(s) of “Responsive” bidders

–     Prepare comparative statement(s) of tender bids

–     Identify the “Successful Bidder” for different tenders

–     Assist to BTCL in contract negotiation with  successful bidder(s) and  preparation of relevant bill of quantities (BOQ) of the contracts

–     Sign relevant contract(s).as Witness”

Phase 3: Installation/Construction Phase

–     Check and Review of the designs and drawings submitted by the contractor(s) ensure compliance with technical specification and field conditions

–     Assistance to BTCL in Factory Tests if desired by BTCL

–     Installation/Construction supervision and submission of reports

–     Witness to acceptance Tests and commissioning of system(s)

–     Checking and certification of As-built drawings and BOQ submitted by contractor(s)

–     Assistance to BTCL for preparation of project completion report(s) to be submitted to JICA.

 

b. Details of Other Implementation Services

In addition to the Engineering Services described above, the consultant will be required to provide the following and implementation Services. In order to fulfill its obligations, the consultant shall keep an office in Dhaka for the entire period of its contract.

Liaison Services:

–     The consultant shall assist BTCL in submission of various reports and feedbacks to JICA and provide necessary presentation(s), if required by JICA. The Consultant will also act as the liaison between BTCL and JICA and other Government Organizations relevant to the project.

–     The Consultant shall assist to BTCL to inform JICA of any change(s) in scope of work, project cost and implementation schedule due to unavoidable and unforeseeable reasons and the relevant countermeasures.

Co-ordination Services:

The consultant shall co-ordinate with the contractors to ensure that all designs, specifications and technical procedures of the project are fully in line with the scope. The consultants shall also co-ordinate with contractor(s) for solution(s) of any problem(s) faced during implementation of the project.

 

The consultants shall be required to submit to BTCL, the following reports and documents for approval of BTCL.

–     Pre-qualification document(s)

–     Pre-qualification evaluation criteria(s)

–     Tender documents including technical specifications, general terms and conditions and contract

–     Cost estimation report(s)

–     Reply to bid enquiries

–     Monthly progress reports

–     Reports on acceptance test procedures

–     Project completion reports

Assignment name:

 

ENGINEERING SERVICES FOR HASNABAD-AMINBAZAR-TONGI 230kV TRANSMISSION LINE (Lot A: Civil Works and Lot-B: Electrical Works)

 

Funding agency: Govt. of Bangladesh

 

Approx. value of the contract (in current US$):

 

US$ 106,633

 

Country: Bangladesh

Location within country: Hasnabad-Aminbazar (Savar)-Tongi

Duration of assignment (months): 33

Name of client:

 

Power Grid Company of Bangladesh Ltd. (PGCB)

Total no. of person-months of the assignment:225

 

 

Address:

 

Project-2 Office: House No. 6, Road No. 23/A, Gulshan-1, Dhaka‑1212, Bangladesh

 

Approx. value of the services provided by the firm under the contract (in current US$):

 

US$ 38,496                  

 

Start date (month/year): July, 2002

Completion date (month/year): March, 2005

No. of professional person-months provided by the joint venture partners or the sub-consultants:

90

Name of joint venture partner or sub-consultants, if any:

 

Progressive Consultants Ltd., Bangladesh(JV Partner)

House of Consultants Ltd., Bangladesh(JV Partner)

Name of senior full time employees of the firm involved and functions performed:

 

Project Manager: Shamsul Hoque, Senior Engineer (Elect.)-1: M.A. Matin, Senior Engineer (Elect.)-2: Shahabuddin Ahmed, Senior Engineer (Elect.)-3: Afzal Ahmed, Senior Engineer (Elect.)-4: Md. Taslimuddin, Senior Engineer (Elect.)-5: Sujatul Islam

Narrative description of project:

 

The objective of the project is checking of drawings and designs submitted by contractor to PGCB for Hasnabad-Aminbazar (Savar)-Tongi 230kV Transmission lines and Sub-station of turnkey contractors.

Description of actual services provided in the assignment:

Checking of layout drawing of Aminbazar, Hasnabad, Tongi 230/132kV sub-stations and Kalyanpur 132/33kV sub-stations.

 

Lot A: Civil Works

–   Checking of design and fabrication drawings and test procedures of different types 230kV and 132kV Transmission lines towers. The type of 230kV & 132kV towers are 2DL 90 nos. (46.5m), 2D1 6 nos. (52.8m), 2D25 10 nos. (45m), 2DT6 12 nos. (46m), 2×25 2 nos. (45m), and 2×60 2 nos. (52m)

–   Checking of overall layout plan and checking of foundation design drawings of Aminbazar 230/132kV substation and extension of Hasnabad, Tongi 230/132kV substations of Kalyanpur 132/33kV substation and checking design of Control room building; Boundary wall and Guard House; Gantry structures for the 230kV and 132kV Switchyard and their foundations; 230/132kV single phase transformer foundations and baffle walls and auxiliary transformer foundations; Structures and foundations for CT, PT, CB, LA and all other ancillary structures; Cable trenches and trench covers; Approach and internal roads; Switchyard fencing and area boundary; and water supply and drainage system.

Lot B: Electrical Works

–   Checking of design of electrical items of works includes (i) Technical specifications and drawings of equipment (transformers, circuit breakers, isolators, CT, CVT, LA and other auxiliary equipment). (ii) protection of control schematic diagrams. (iii) Interlocking schemes. (iv) Fibre optic multiplexer equipment for communication and power line carrier communication equipment. (v) Sub-station grounding and earthing system. (vi) AC and DC systems and (vii) Supervision of testing and commissioning of sub-station equipment, protection and communication equipment.

Assignment name:

 

60 MW SIKALBAHA POWER STATION REHABILITATION

 

Funding agency: Government of Bangladesh

 

Approx. value of the contract (in current US$):

 

N/A

Country: Bangladesh

Location within country: Chittagong

 

Duration of assignment (months): 24

Name of client:

 

Bangladesh Power Development Board

 

Total no. of person-months of the assignment: 33

Address:

 

23/1, Motijheel C/A, Dhaka-1000

 

Approx. value of the services provided by the firm under the contract (in current US$):

 

US$ 107,600

 

Start date (month/year): March, 1998

Completion date (month/year): February, 2000

No. of professional person-months provided by the joint venture partners or the sub-consultants: 03

 

Name of joint venture partner or sub-consultants, if any:

 

M/s. Black & Veatch International, USA

 

Name of senior full time employees of the firm involved and functions performed:

 

Senior Electrical Engineer: Ali Amjad Miah, Senior Mechanical Engineer: A.B. Siddique, Senior Instrument & Control Engineer: A.H. Chowdhury, Electrical Engineer: Shahbuddin Ahmed, Mechanical Engineer: Idrisur Rahman, Instrument & Control Engineer: Joynal Abedin,  Engineer (Civil): Syed Nasiruddin Ahmed        

 

Narrative description of project:

 

Bangladesh Power Development Board signed a turnkey contract with North China International Power and Economic Trade Corporation (NCIP) for Rehabilitation of 60 MW Sikalbaha Power Station. The salient feature of the turnkey project was to rehabilitate the work of 60 MW Sikalbaha Steam Power Station, Chittagong.

 

Description of actual services provided in the assignment:

 

–    Miscellaneous rehabilitation works included the work of Silencer for boiler, exhaust muffler for turbine warm up system, FD fan sound attenuation, D.C. lub oil pump, mechanical workshop, corrosion protection, painting and diesel power station overhauling.

–    Circulating water intake pump house: This included the installation of bar screen, moving screen and spray water system.

–    Firefighting pump house: This included laying of 1000m firefighting pipe line and an installation of a fire fighting pump house.

–    Sampling system for water steam analysis: This included the installation of sampling rack for sampling of boiler & turbine water at different stages.

–    Water treatment plant: This included the installation of mix bed, acid pump, raw water pumps, etc.

–    Electrical rehabilitation work: This included installation of 132/33 KV, 41.5 MVA transformer, extension of 6.6 KV system and supply of cables, instrument for electric workshop.

–    Rehabilitation of instrumentation of control equipment: This included supply of different equipment for electrical and mechanical instruments, other auxiliary and general system of plant and supply & installations of Process Control Operation Management (PCOM).