DDC’s information and communications technology (ICT) consultancy wing ensures that technology not only meant to meet the requirements of its users but that it is implemented and managed to realize the envisaged benefits. We are committed to bring a positive and visible difference by assisting our valued clients in choosing the optimum solution that fully interprets its business drivers and delivering a fit-for-purpose outcome. In ICT, DDC provides expert consultancy that covers the full lifecycle of the design and implementation of systems. We bring our expertise to ensure that the ICT strategy is comprehensive, the design is robust, the implementation is successful and the ongoing management delivers the expected benefit.
The comprehensive approach covers a wide range of disciplines including resource planning, enterprise architecture, business analysis, systems engineering and service management. Our key area of expertise includes information security, identity management, collaboration, ICT application in construction, high integrity systems, software engineering, software assurance etc.
DDC, a multi-discipline consulting house, has been providing services to the government, private and international organizations for a wide range of assignments involving project preparation to completion through project preparatory technical assistance, techno-economic feasibility study, environment & social impact assessment, project planning, design, development, implementation management/monitoring/supervision, procurement assistance, post implementation service/evaluation etc.
DDC has been actively participating in a large number of projects of Bangladesh Government as well as of private enterprise in the field of ICT, Telecommunication, infrastructure development/reconstruction/ rehabilitation, Urban & regional planning and a institutional development etc. including projects financed by the World Bank (WB), International Development Association (IDA), International Finance Corporation (IFC), Asian Development Bank (ADB), Japan International Cooperation Agency (JICA), DFID and other international organizations. These projects had been or are being carried out either independently or in collaboration with internationally reputed consulting firms.
The list below shows number of projects undertaken by DDC in different sectors:
- ICT – 30 nos.
- Building – 80 nos.
- Rural Infrastructure – 27 nos.
- Roads and Highways – 40 nos.
- Water Resources and Environmental Study – 56 nos.
- Bridge – 35 nos.
- Power Generation and Transmission – 25 nos.
- Ports and Jetty – 14 nos.
- Agriculture and Forestry – 06 nos.
- Factory and Industry – 10 nos.
- Water Supply and Sanitation – 09 nos.
- Urban and Regional planning – 40 nos.
DDC provides Information & Communication Technology (ICT) based total business solutions. Ranges of service include –
- Feasibility study and project preparation
- Project planning
- Study and design of systems architecture
- Detail design of application software, system/data center, data storage & recovery system, data communication networks, etc. including specification of database engine, OS, application development tools, hardware, network devices, peripheral equipment/devices, monitoring devices, anti-virus software etc..
- Development, testing and debugging of Database/MIS/GIS/Web application
- Procurement service for computers, network/network devices, software, peripherals etc.
- Installation and commissioning of system hardware, software, network/network devices etc.
- Integration and implementation of application software and system/network
- Training and capacity building of client officials
- Post implementation operation support service, and
- Operation, Maintenance and IT infrastructure’s Security related issues.
DDC successfully rendered ICT services for a good number of projects predominantly for government agencies. The table in the following section presents highlights of ICT projects undertaken by DDC.
ICT Projects/Assignments Undertaken by DDC | ||||||
Sl. No. | Project & Funding | Client & Address | Period | Service | Staff Month | Fee (Tk.) |
1. | Technical Support for ICT Learning Centers (ILC) Network Operations Funding agency: ADB
| Directorate of Secondary and Higher Education. 5th Floor, Second Block, Shikkha Bhaban, 16/ Abdul Ghani Road, Dhaka- 1000 Facsimile: +88-02-9586785 E-mail: jpd.sesip@gmail.com or shiponkd@hotmail.com | April 2018 to Dec 2018 | A)Design, development & implementation of ICT Learning Centers (ILC) Monitoring Dashboard for ILCs
Also, it serves as a common platform for the responsible technical personnel to address different issues to higher authorities.
1.Develop an application for usage and maintenance of e-learning materials on the LAN server based on software and e-Learning materials (6 subjects) delivered by NCTB (SD-13). Currently there are 150 contents in total which are also present in all ILC through ReLM.
Provide operational instructions for teachers and students for using the e-learning materials repository in collaboration with NCTB (SD-13)
A web based and mobile application for the IT personnel responsible for ILC. Through this system the responsible person can respond to request, discuss an issue with others, and solve problems regarding ILCs remotely. End-users can raise issue if there are any problems found in any ILCs. Also serves as a common platform for maintaining and troubleshooting ILCs. | 50 | 21,237266 |
ICT Projects/Assignments Undertaken by DDC | ||||||
Sl. No. | Project & Funding | Client & Address | Period | Service | Staff Month | Fee (Tk.) |
2. | Development & Implementation of MEMIS Development, DC & DR Center Establishment Funding agency: GoB
| Madrasah Educational Management and Information System (MEMIS) Level 2, Red Crescent Borak Tower 37/3/A Eskaton Garden Road, Dhaka Phone : 88024103016 | June 2018 to June 2019 (90% done) |
| 314 | 21,031,579 |
ICT Projects/Assignments Undertaken by DDC | ||||||
Sl. No. | Project & Funding | Client & Address | Period | Service | Staff Month | Fee (Tk.) |
3. | CONSULTING SERVICES FOR DETAIL DESIGN, TENDER ASSISTANCE AND CONSTRUCTION SUPERVISION FOR DHAKA MASS RAPID TRANSIT DEVELOPMENT PROJECT (LINE-5): NORTHERN ROUTE [MRT Line-5] (Loan Agreement No.: BD-P101, Contract No. S-1) | Dhaka Mass Transit Company Limited 71-72 Old Elephant Road Probashi Kalyan Bhaban (13th Floor) Eskaton Gardens, Dhaka Bangladesh | July, 2020 To February, 2032 | Scope of works Services for Pre-Construction Stage – Field Survey and Investigation – Basic Design and Cost Estimation – Construction Plan – Safety Management Guidelines during Construction – Detailed Design and Cost Estimation – Review of Bidding Packages – Procurement Assistance – Pre-Qualification Documents and Bid Documents – Pre-Qualification (PQ) of Applicants – Bid Call and Pre-bid Conference – Bid Evaluation and Clarification – Contracting – Safety Measures Construction Supervision Stage – Construction Site Hand Over – Review of the contractors Submittals and Design Interface – Site Supervision – Material Testing – Work Acceptance, Disbursement Request, and Payment Certificate – Amendment, Changes, Variation and Disputes – Monthly and Ad Hoc Progress Meeting – Meeting for Coordination and Record – Testing and Commissioning Services for Post-Construction Stage Final Acceptance – Defects Liability Period – Final Taking Over C.2 Project Completion Report C.3 Monitoring and Advising Operation and Maintenance – Assistance and Advice on Train Operation & Mechanical Equipment – Assistance and Advice on Rolling Stock and Depot – Assistance and Advice on Signal, Telecommunication & Power Supply – Assistance and Advice on Civil and Track Works | 1,051 | 2,992,346,000 |
ICT Projects/Assignments Undertaken by DDC | ||||||
Sl. No. | Project & Funding | Client & Address | Period | Service | Staff Month | Fee (Tk.) |
4. | Design & Supervision Consultancy of Multipurpose Disaster Shelter Project (MDSP) [Contract Package No. LGED/MDSP/D3.2/SD-1 Phase-I] Funding agency: World Bank and Govt. of Bangladesh; Name of associated firm, if any: CDM Smith Inc., USA (Lead Partner) | Local Government Engineering Department, Ministry of LGRD&C, Govt. of Bangladesh. Workshop Bhaban, Level-3, Agargaon, Sher-E-Bangla Nagar, Dhaka-1207 | March 2016 to Feb 2022(1st phase Completed) |
| 1312 (Professionals)- 3974 (Others) | 27,058,500,000 |
ICT Projects/Assignments Undertaken by DDC | ||||||
Sl. No. | Project & Funding | Client & Address | Period | Service | Staff Month | Fee (Tk.) |
5. | IT Enable Service for Enhancement, Operation Support and Maintenance of the RJSC Computerized Application Funding: GOB
| The Registrar, Joint Stock Companies & Firms (RJSC), Ministry of Commerce, GOB, TCB Bhaban, 6th Floor, 1 Kawran Bazar, Tel: 88 02 8189401, 88 02 8189403 Email: rjsc@roc.gov.bd | May 2015 to May 2018 | Enhancement of the RJSC computerized application software ensuring extended service/features, improvement of availability, performance, security, monitoring and so on for On line Transaction Processing (OLTP), online payment (e-payment) and implementation of digital signature, DRS etc., upgrading of the data centre comprising of redundant Database servers, redundant web servers, mail server, desk top computers, printers, scanners etc. upgrading of the data communication network (Internet WAN and LAN), provide operation support services and maintenance of the computerized system/application, procurement support service, provide services to clients through help desk etc. Solution Architecture – Operating System: Red Hat Linux Enterprize-4 Application Model: LAN, WAN, Web Database Server: Oracle 11g Release-2 Application Server: Oracle 11g Application Server Server Side: PHP Development Tools: Oracle Developer 11g Reporting Tool: Oracle Developer 11g Report Builder Firewall :Shorewall Front-End: Standard Web Browser
| 561 | 38,200,000 |
ICT Projects/Assignments Undertaken by DDC | ||||||
Sl. No. | Project & Funding | Client & Address | Period | Service | Staff Month | Fee (Tk.) |
6. | Financial Management & Municipal Finance Consultancy (FMMFC) & Computerization of seven (7) City Corporations, Pk-B; Urban Public and Environmental Health Sector Development Project (UPEHSDP) Funding: Asian Development Bank (ADB) and Govt. of Bangladesh | The Project Director, PMU, UPEHSDP, Local Gov Division, Ministry of LGRD&C, GOB 5, Phoenix Road, Nagar Bhaban, Level-11, Fulbaria, Dhaka-1000, Tel: 02 27116247 | May 2012 to Jun 2020 | The Financial Management and Municipal Finance Consultancy (FMMC) is providing consultancy service for substantially reforming and improving financial management of seven (7) City Corporations namely Dhaka (South), Dhaka (North), Chittagong, Khulna, Rajshahi, Barisal and Sylhet City Corporations and introducing modernized web based computerized accounting systems, and performance based budgeting to enhance financial management, improving tax collection and expanding the tax base to strengthen municipal finances, and also conduct regular concurrent audits of City Corporations to ensure high degree of adherence to various procurement and financial management guidelines. Providing consultancy services for –
Computerized Financial Management Information
The computerized system comprises of a Central Server at the Ministry (MLGRD&C) and a Local Server at each of the seven (7) City Corporations in Dhaka (2), Chittagong, Rajshahi, Khulna, Barisal and Sylhet. | 561 | 133,000,000 |
ICT Projects/Assignments Undertaken by DDC | ||||||
Sl. No. | Project & Funding | Client & Address | Period | Service | Staff Month | Fee (Tk.) |
7 | Consultancy Services for Information & communication Technology (ICT) and Management Information System (per IDAP), (RSRP Contract Package No. S-8) Funding: International Development Association (IDA), WB | Roads and Highways Department, Ministry of Communication, Roads & Highways Department, GOB Sarak Bhaban, Ramna, Dhaka, Bangladesh, Tel: 029562829, 9562798 | Nov 2008 to Sep 2009 |
| 100 | 7,700,000 |
ICT Projects/Assignments Undertaken by DDC | ||||||
Sl. No. | Project & Funding | Client & Address | Period | Service | Staff Month | Fee (Tk.) |
8 | Database Management Program of the Health and Family Welfare Facilities under Health and Population Program Project (HPPP), IDA Credit No. 3101-BD Funding: International Development Agency (IDA) | Construction and Maintenance Management Unit (CMMU), Ministry of Health & Family Welfare (MOHFW), GOB 105-106 Motijheel C/A, Dhaka-1000, Fax: 029667477
| Nov 2000 to Jun 2003 | 1. Designed, developed and implemented a central integrated MIS & GIS database management system (serving LAN clients) of the Health & Family Welfare Facilities (5027 nos., national to union level distributed in the entire country under the Ministry of Health & Family Welfare) for future infrastructure development planning. The database comprised of the following information of the health & family welfare facilities: | 831 | 61,745,995 |
ICT Projects/Assignments Undertaken by DDC | ||||||
Sl. No. | Project & Funding | Client & Address | Period | Service | Staff Month | Fee (Tk.) |
9 | Consultancy Services For Detailed Design and Tender Assistance for Dhaka Mass Rapid Transit Development Project ()-MRT-Line-1(E/S)- Japan International Co-operation Agency(JICA) Loan Number-BD-P95 Nippon Koei Co. Ltd., Japan (JV Lead Partner) Nippon Koei India Pvt. Ltd., India Oriental Consultants Global Co., Ltd. Systra S.A (France) Delhi Metro Rail Corporation Ltd. , India Katahira and Engineers International (Japan)
| Dhaka Mass Transit Company Limited 71-72 Old Elephant Road Probashi Kalyan Bhaban (13th Floor) Eskaton Gardens, Dhaka Bangladesh | October, 2018 to April, 2022 | Services: – Carryout all the required engineering surveys and investigations; – Review and verify all available primary and secondary data collection; – Preparation of basic design; – Preparation of detailed design; – Tender assistance; – Facilitation of implementation of Environmental Management Plan (EMP), Environmental Monitoring Plan (EMoP) and Resettlement Action Plan (RAP); – Technology transfer; – Institutional development assistance; – Non-rail business strategy plan, design and development and station area development; – Security assistance and risk mitigation; Depot site selection; – Assist in DMTCL for utility verification and relocation of utilities; – Public relations activities; and – Integration of MRT Line 1 and MRT Line 6 between Motijheel and Kamlapur station. | 971.10 | 508,581,900 |
ICT Projects/Assignments Undertaken by DDC | ||||||
Sl. No. | Project & Funding | Client & Address | Period | Service | Staff Month | Fee (Tk.) |
10 | Design and Supervision for Outfit of NDMRTI & ERCC at DDM Bhaban, Dhaka [IDA Credit No.: 5599-BD] | Department of Disaster Management, Urban Resilience Project (DDM Part), Ministry of Disaster Management and Relief, Govt. of Bangladesh Level # 4, House # 121, Road # 21, DOHS, Mohakhali, Dhaka-1206 | Feb 2018 to Jan 2019 |
| 51 | 2,990,850 |
ICT Projects/Assignments Undertaken by DDC | ||||||
Sl. No. | Project & Funding | Client & Address | Period | Service | Staff Month | Fee (Tk.) |
11 | TA-9052 BAN: DHAKA METRO PROJECT ̶ PRE-FEASIBILITY STUDY CONSULTANT (49258-001) (MRT LINE-5) | Dhaka Mass Transit Company Limited 71-72 Old Elephant Road Probashi Kalyan Bhaban (13th Floor) Eskaton Gardens, Dhaka Bangladesh | May, 2018 To March, 2019 | Description: In order to release Dhaka city from overwhelming traffic pressure, the Government of Bangladesh intended to improve the public transport system in Dhaka by constructing couple of additional metro lines in parallel to MRT Line-6. As a part of this intention, ADB approved the Project Preparatory Technical Assistance (PPTA) on Dhaka Metro Project in December, 2015 to assess the Revised Strategic Transport Plan (RSTP) and prepare a priority metro project for investment by ADB. The PPTA aimed to prepare pre-feasibility study of the priority line and define the scope for detailed design to be carried out under the proposed TA loan. The PPTA for this component will be carried out in two phases i.e. in the first phase, the consultant will review the RSTP; and confirm the Line 5 South as a priority metro line; and in the second phase, the PPTA will prepare the pre-feasibility study for the selected Line 5 South, carry out the related surveys and studies and define the scope for the detailed design to be carried out under the proposed TA loan. Major activities of the project: – Network review; – Pre-feasibility study; – Economic/financial analysis; and – Institutional assessment. Services: – Review RSTP & other master plans, traffic data and studies and conduct traffic survey, analysis, modeling and ridership forecast; review demand forecast; study station & depot location, GIS database and mapping, preliminary geometric design for viaduct & underground/elevated station structures, BOQ, cost estimate; development of design standard; prepare & review technical specification for rolling stock track, signal, telecom & interlocking systems, structure gauges; undertake governance appraisal; assist in preparing financial plan, fund flow arrangements & schemes, financial projections & analysis; identification of avenues for private investment; carryout comparative financial and economic evaluation and analysis to derive a PPP Model (Public Private Partnership); identification of institutional & financial requirements to maintain sustainability of metro operations; prepare document for ADB to proceed with loan, recommend bid evaluation procedure, prepare procurement plan with indicative implementation schedule in line with consultant recruitment & capacity assessment for executing agency; recommend power supply system with location for substations & feeding lines; outline safety guidelines & procedures for electric train operation; undertake poverty & social analysis, screening indigenous inhabitants, gender analysis & prepare indigenous peoples plan; advisory assistance to minimize resettlement impact, prepare environmental categorization form & rapid environmental assessment checklist; prepare assessment review framework with analysis of alternatives for depot sites, prepare resettlement plan & involuntary resettlement screening etc. | 38 | 17,743,344 |
ICT Projects/Assignments Undertaken by DDC | ||||||
Sl. No. | Project & Funding | Client & Address | Period | Service | Staff Month | Fee (Tk.) |
12 | IT Enable Service for Digitization and Integration of the Historical Paper Based Records with the RJSC Computerized Application in Operation Funding agency: Nil | Joint Stock Companies and Firms (RJSC), Ministry of Commerce, GOB TCB Bhaban, 1 Kawran Bazar (6th floor), Dhaka 1215 Facsimile : 028189402 E-mail : rjsc@roc.gov.bd | April 2018 to July 2019 (75% done) | The scope of service shall include –
Solution Architecture – Operating System: Red Hat Linux Enterprize-4 Application Model: LAN, WAN, Web Database Server: Oracle 11g Release-2 Application Server: Oracle 11g Application Server Server Side: PHP Development Tools: Oracle Developer 11g Reporting Tool: Oracle Developer 11g Report Builder Front-End: Standard Web Browser | 628 | 39,956,021 |
ICT Projects/Assignments Undertaken by DDC | ||||||
Sl. No. | Project & Funding | Client & Address | Period | Service | Staff Month | Fee (Tk.) |
13 | National Household Database Public Information Campaign (NHD-PIC)project Bangladesh Bureau of Statistics(BBS) Statistics and Information Division(SID)
| Bureau of Statistics(BBS) Statistics and Information Division(SID) Parisankhyan Bhaban (9th floor,Block-1),E-27/A, Agargaon ,Dhaka-1207,Bangladesh | Jan 2017 to Dec 2017 |
Oversee troubleshooting, system backup, archiving and disaster recovery and provide expert support. | 75 | 51453424.67 |
ICT Projects/Assignments Undertaken by DDC | ||||||
Sl. No. | Project & Funding | Client & Address | Period | Service | Staff Month | Fee (Tk.) |
14 | Governance Improvement And Capacity Development (GICD) Consultancy Services of ADB & OFID Assisted Third Urban Governance & Infrastructure Improvement (Sector) Project (UGIIP-III) [Loan No. 3142-BAN (SF)] Funding agency: Asian Development Bank, OFID and Govt. of Bangladesh Name of associated firm,: Resource Planning and Management Consultants (RPMC) (JV Lead Partner) Kranti Associates Ltd. | Local Government Engineering Department, Local Government Division. LGED Bhaban, Agargaon, Sher-E-Bangla Nagar, Dhaka | March 2015 to Feb 2019 |
| 648 | 403,945,687 |
ICT Projects/Assignments Undertaken by DDC | ||||||
Sl. No. | Project & Funding | Client & Address | Period | Service | Staff Month | Fee (Tk.) |
15 | Consultancy Services For Governance And Infrastructure Improvement (GII) Under City Governance Project (CGP) For Targeted Five (5) City Corporations (Loan Agreement No.: BD-P97, Contract No.: LGED/PD/ICGP/SD/GII/01/2014-15) Funding agency: Japan International Cooperation Agency (JICA) PADECO Co., Ltd., Japan (JV Lead Partner) High-Point Rendel, UK NJS Consultants Co., Ltd., Japan BCL Associates Ltd., Bangladesh | Local Government Engineering Department (LGED) LGED Head Quarter, Level-5, Agargaon, Sher-e-Bangla Nagar, Dhaka-1207 | July 2015 to March 2020 |
| 867 | 1,814,280,425 |
ICT Projects/Assignments Undertaken by DDC | ||||||
Sl. No. | Project & Funding | Client & Address | Period | Service | Staff Month | Fee (Tk.) |
16 | Consultancy Services For Design, Construction Supervision, Procurement Support And Management Of Dhaka Mass Rapid Transit Development Project (Contract No. S-1)-MRT-Line-6- Japan International Co-operation Agency(JICA) Loan Number-BD-P69 Nippon Koei Co. Ltd., Japan (JV Lead Partner) Nippon Koei India Pvt. Ltd., India Delhi Metro Rail Corporation Ltd., India Mott MacDonald Ltd., UK Mott MacDonald Pvt. Ltd., India | Dhaka Mass Transit Company Limited 71-72 Old Elephant Road | Feb 2014 to June 2023 | Scope of works Services for Pre-Construction Stage
Construction Supervision Stage
| 3,306 | 9,281,726,903 |
ICT Projects/Assignments Undertaken by DDC | ||||||
Sl. No. | Project & Funding | Client & Address | Period | Service | Staff Month | Fee (Tk.) |
17 | Dhaka Integrated Traffic Management Project – Technical Assistant Services Funding agency: Japan International Cooperation Agency (JICA) | Department Infrastructure Development Division Overseas Consulting Administration Nippon Koei Co., Ltd. 4, Kojimachi 5-chome, Chiyoda-ku, Tokyo 102- 8539, Japan | May 2014 to 2018 June |
Technical Assistance Project Proforma/Proposal (TPP), Development Project Proposal (DPP),Term of Reference (TOR), Expression of Interest (EOI) and Request for Proposal (RFP) preparation | 44 | 6,456,400 |
ICT Projects/Assignments Undertaken by DDC | ||||||
Sl. No. | Project & Funding | Client & Address | Period | Service | Staff Month | Fee (Tk.) |
18 | Re-engineering, Modification, Operation & Maintenance, Training & Capacity Building of Staff – Computerization of the Office of the Registrar Joint Stock Companies & Firms (RJSC) Funding: GOB | The Registrar, Joint Stock Companies & Firms (RJSC), Ministry of Commerce, GOB, TCB Bhaban, 6th Floor, 1 Kawran Bazar, Tel: 88 02 8189401, 88 02 8189403, Email: rjsc@roc.gov.bd | Jul 2011 to Mar 2015 | RJSC undertook a project to computerize its office enabling online service to its clients, online transaction processing (OLTP) and e-payment, An integrated web based centralized computerized application was developed and implemented for the purpose. Subsequently RJSC sought services for re-engineering & modification, operation support & maintenance of the application. Providing Professional Services for –
| 468 | 40,202,000 |
ICT Projects/Assignments Undertaken by DDC | ||||||
Sl. No. | Project & Funding | Client & Address | Period | Service | Staff Month | Fee (Tk.) |
19 | Governance Improvement And Capacity Development (GICD) Under ADB, KFW & GTZ Assisted Second Urban Governance And Infrastructure Improvement (SECTOR) Project (UGIIP-II) Funding: [LOAN NO. 2462-BAN (SF)] [ADB Best Project Awarded] Name of associated firm: SODEV Consult, Bangladesh (JV Lead Partner) BCL Associates Ltd., Bangladesh | Local Government Engineering Department, Local Government Division, Ministry of LGRD&C, Govt. of Bangladesh LGED Bhaban, Agargaon, Sher-E-Bangla Nagar, Dhaka | Sep 2010 to 2014 |
| 552 | 185,421,943 |
ICT Projects/Assignments Undertaken by DDC | ||||||
Sl. No. | Project & Funding | Client & Address | Period | Service | Staff Month | Fee (Tk.) |
20 |
Telecommunication Network Development Project (BD-P53) Funding: Japan International Cooperation Agency (JICA)
| Bangladesh Telecommunication Company Limited | Nov 2010 to Oct 2013 | Detailed systems & network design, preparation of cost estimate, tender documents, assits in tendering and evaluation process to improve the existing telecommunication Services of Bangladesh.
| 162 | 60,000,000 |
ICT Projects/Assignments Undertaken by DDC | ||||||
Sl. No. | Project & Funding | Client & Address | Period | Service | Staff Month | Fee (Tk.) |
21 |
Development of a Personal Information Management System (PIMS) for the Civilian Staff of Bangladesh Army Funding: GOB
| IT Directorate, Army Headquarters, Bangladesh Army, GOB Dhaka Cantonment, Dhaka, Tel: 8750011 ext. 2422 (Office), | Feb 2005 to May 2006 |
|
|
|
ICT Projects/Assignments Undertaken by DDC | ||||||
Sl. No. | Project & Funding | Client & Address | Period | Service | Staff Month | Fee (Tk.) |
22 | Consulting Services for Strengthening Project Portfolio Performance (SPPP) Project(IMED); Funding: GOB | Implementation Monitoring and Evaluation Division (IMED); Ministry of Planning, GOB, SPPP Project, IMED Room No. 6, Block-12, Sher-e-Bangla Nagar, Dhaka-1207 Tel: 029118070 Fax: 8122210 | Jun 2005 to May 2006 |
| 45 | 2,162,625 |
ICT Projects/Assignments Undertaken by DDC | ||||||
Sl. No. | Project & Funding | Client & Address | Period | Service | Staff Month | Fee (Tk.) |
23 | Computerization of the Office of the Registrar Joint Stock Companies & Firms (RJSC), Ministry of Commerce (MoC), GOB Funding: International Finance Corporation (IFC) | International Finance Corporation (IFC); Washington DC, USA; IFC Local Office: IFC-SEDF & IFC-BICF; United House, 10 Gulshan Ave, Gulshan 1, Dhaka 1212, Tel: 028833752-66 Beneficiary: Registrar, Joint Stock Companies & Firms (RJSC), MoC, GOB | Oct 2005 to Jun 2011 | 1. Designed and developed web based online business solution application software (serving LAN, WAN & Web clients) comprising of a website and the following modules:Dynamic website www.roc.gov.bd | 868 | 58,863,970 |
ICT Projects/Assignments Undertaken by DDC | ||||||
Sl. No. | Project & Funding | Client & Address | Period | Service | Staff Month | Fee (Tk.) |
24 | Pilot Testing & Implementing Decentralized “Education Management Information System (EMIS)” under “Secondary Education Sector Improvement Project (SESIP)”-ADB Loan No. 1690-BAN (SF) Funding: Asian Development Bank (ADB) | Directorate of Secondary and Higher Education (DSHE), Ministry of Education, GOB Shikkha Bhaban, 5th floor, Block-2, 16 Abdul Gani Road, Dhaka-1000, Tel: 9553712, Fax: 880-2-7168315, email: sesipta@dhaka.net | Mar 2003 to Dec 2006 |
i. Education Institute Management 2. Designed and rendered procurement assistance and supervised implementation work of Metropolitan Data Communication Network (MAN) among DSHE, Ministry of Education and BANBEIS
| 326 | 17,068,020 |
ICT Projects/Assignments Undertaken by DDC | ||||||
Sl. No. | Project & Funding | Client & Address | Period | Service | Staff Month | Fee (Tk.) |
25 | Consolidation of Institutional Development Component-3 (CIDC-3) Funding: ODA | Roads and Highways Department, Ministry of Communication, GOB Sarak Bhaban, Ramna, Dhaka, Fax: 880-2-9565673, email:info@wspdhaka.com | Apr 2003 to Mar 2006 | 1. Consolidate the integrated GIS/MIS Application (serving LAN, WAN and Web clients) to Support Maintenance and Management Program of Roads and Bridges under Roads and Highways Department (RHD) that implements the following functionality: | 297 | 27,762,000 |
ICT Projects/Assignments Undertaken by DDC | ||||||
Sl. No. | Project & Funding | Client & Address | Period | Service | Staff Month | Fee (Tk.) |
26 | Establishment of a Table of Equipment (TOE) for Different Category of Hospitals/Health Services Institutions with Standard Specification and Preparation of a Database under Health and Population Sector Program Project (HPSPP), GOB – IDA Credit No. 3101-BD Funding: IDA | Central Medical Stores Depot (CMSD), Ministry of Health & Family Welfare (MOH&FW), GOB 30 Shaheed Tajuddin Ahmed Sharani, Tejgaon, Dhaka-1208 Fax: 029126547 | Jun 2001 to Jun 2002 |
| 74 | 4,004,101 |
ICT Projects/Assignments Undertaken by DDC | ||||||
Sl. No. | Project & Funding | Client & Address | Period | Service | Staff Month | Fee (Tk.) |
27 | Management & Supervision Consultancy for Distribution Network Improvement under Dhaka Environmentally Sustainable Water Supply Project: Loan No.-3051 BAN, DWASA | Employer: DWASA Project Director Address: Office of The MD,WASA Bhaban,98,Kazi Nazrul Islam Avenue,Dhaka-1215 Phone:47215335 | Apr 2015 To Dec 2021 |
• Establishment of assets management System. | 341 | 19850000 |
ICT Projects/Assignments Undertaken by DDC | ||||||
Sl. No. | Project & Funding | Client & Address | Period | Service | Staff Month | Fee (Tk.) |
28 |
Consulting Services For Architectural, Structural, Plumbing And Electro Mechanical Design, Assessment, Supervision And Other Related Services Of Urban Building Safety Project [JICA loan no. BD-P84-01]
| Public Works Department Ministry of Housing and Public Works, GoB Address: Purta Bhaban, Segunbagicha, Dhaka-1000 | May, 2017 To April, 2022
|
9. The Consultant shall arrange the overseas training/exposure trip to get knowledge about updated technology (ex. base-isolated structure, Central air conditioning, BEMS using IT, Sound insulation system, CASBEE, fire safety design and management including fire command center, central air-conditioning design and installation, water supply, Air extraction system etc).
11. Design and monitor BEMS & electronic parking system of the FSCD headquarter | 233 | 487,549 |
ICT Projects/Assignments Undertaken by DDC | ||||||
Sl. No. | Project & Funding | Client & Address | Period | Service | Staff Month | Fee (Tk.) |
29 |
Project Name: Design and Supervision Consultancy (including Environment and MIS) of Emergency Multi-Sector Rohingya Crisis Response Project (EMCRP) [Grant No. D419-BD, Contract Package No. EMCRP / DS / S1] Country : Bangladesh (ICT Component) Funding: World Bank Grant No:D419-BD
| Employer: Local Government Engineering Department, Ministry of LGRD&C, Govt. of Bangladesh Address: Local Government Engineering Department Ministry of LGRD&C, Govt. of Bangladesh Workshop Building, Level-3, LGED Head Quarter, Agargaon, Sher-E-Bangla Nagar, Dhaka-1207, Bangladesh. Tel: +880-2-8143334, Fax: +880-2-58155304 |
October, 2019 To October, 2021
| . Information and Communications Technology (ICT) monitoring
| 234 | 136000000 |
ICT Projects/Assignments Undertaken by DDC | ||||||
Sl. No. | Project & Funding | Client & Address | Period | Service | Staff Month | Fee (Tk.) |
30 |
Institutional Development Component (IDC-3) Road Rehabilitation and Maintenance Project-3 Funding: ODA
| Roads and Highways Department, Ministry of Communication, GOB Sarak Bhaban, Ramna, Dhaka Fax: 880-2-9565673 email:info@wspdhaka.com |
Jan 1999 to Mar 2003 |
| 324 | 54,558,790 |