Duration: October, 1998-August, 2000 1998 flood damage rehabilitation project of roip and rip roads

Description:

The project involved damage assessment, design, preparation of tender documents and construction supervision of road stretches damaged by 1998 floods in Dhaka, Chittagong and Comilla zones of RHD.

Services:

– Undertaking of assessment of damage due to floods of roads and bridges;
– Preparation of design and drawings and undertaking of cost estimates;
– Preparation of tender documents;
– Prequalification of contractors;
– Bid evaluation and selection of contractors;
– Supervision of construction works;
– Certification of payment;
– Preparation of reports.

Funding agency: Asian Development Bank