Duration: November, 1998-December, 2001 109 mw haripur power station extension project (combined cycle)

Description:

In order to meet generation shortfall BPDB desired to add one Gas Turbine Generating unit (33MW), four Exhaust Heat Recovery Boilers and two steam turbine Generating sets to the existing 3×33 MW Gas Turbine Power Station.

Services:

– Site investigation;
– Detailed engineering design;
– Preparation of tender documents;
– Evaluation of bid proposals;
– Contract negotiation and supervision during implementation stage of the project.

Funding agency: OECF, Japan