Duration: May 1985-December 1988 Special water supply scheme for chittagong hill tracts districts

Description:

The project objective was to assess the requirement of water and the support facilities to ensure the water supply to the Chittagong Hill Tracts districts. The project envisaged to conduct all kinds of hydrological and hydrogeological investigations to ascertain the underground water reservoir and design of complete water supply system of the district.

Services:

– Collection of data on existing water supply facilities
– Conducting all kinds of engineering survey
– Socio-economic survey
– Detailed design of overhead water tank and water distribution system
– Economic evaluation of the project.

Funding agency: Government of Bangladesh