Duration: July, 2008-September, 2009 Engineering services for rehabilitation of karnaphuli hydro power plant unit-3

Description:
Rehabilitation of Kapati Hydro Power Station, Unit # 3. Assisting BPDB in the successful rehabilitation work of unit # 3 of the Kurnafuli Hydro Power Plant.

Services:
Full time supervision of the Rehabilitation of the Power Plant. Assisting BPDB in finalizing the schedule with the Contractor for Manufacturing, installation and testing of power station equipment/material to be incorporated in the power plant. To insure that rehabilitation/construction/installation works are done as per approved drawings and specification. Assisting Foreign associated consultant in preparation of monthly & quarterly progress reports. Assisting BPDB in accepting and taking over of the works. Examining and authenticating the as built drawings prepared by the contractor. Prepare completion report (test report, as built drawings, etc). Witnessing pre commissioning test, Trail run, continuous operation test commissioning, Handing over and taking over of the power plant, and other related works.

Funding agency: Government of Italy