Duration: February, 1990-March, 1992 Cyclone protection project-ii

Description:

The project involved improvement of existing 300 km coastal embankments and 389 existing hydraulic structures including 190 km of new embankment, 279 new hydraulic structures and some 70 km of protection works including improvement of drainage system. The project also comprised repair and improvement of feeder roads in the coastal areas.

Services:

– Engineering survey and hydro-morphological investigation
– Detailed foundation investigation of existing embankment and structures
– Assessment of protection work
– Feasibility study of 23 nos. coastal polders
– Environmental impact assessment and resettlement issues
– Hydraulic studies
– Numerical modelling of extreme cyclone generated surges
– Detailed design of embankment, hydraulic structures
– Design of rehabilitation of canals for drainage and irrigation
– Preparation of project preparation report.

Funding agency: EEC