Airport

Air travel is vital to the global economy and planning for growth is essential to ensure that airports can adapt appropriately in the years to come. We DDC, understand the necessity of an integral long-term development plan to guide the future airport.

The services DDC offers under airport engineering includes but not limited to site selection & feasibility studies; analysis of existing airport facilities and capacities; peak and annual traffic forecasting; phase-wise development together with new runway construction and extension with regard to necessities and financial possibilities; airside, terminal and landside capacity analysis and sizing; airport process optimization studies; land use planning & master planning which integrates the strategic airport development objectives; airside and landside traffic simulations; architectural design; airport building optimization – including terminal buildings; airport infrastructure – aprons, runways, taxiways and landside infrastructure etc.; airfield special systems – apron systems, airfield ground lighting and navigational aids etc.; soil investigations and pavement design & engineering; drainage system design and engineering; preparation of tender documents; construction supervision and contract management.

We at DDC use several technologies, such as BIM/CIM, 3D modelling software and state-of-the-art simulation programmes to shape all our engineering projects

S/N)

Airport

 

 

 

 

 

1.              

Engineering Services (Stage 1) of ChittagongAirport Development Project

Civil Aviation Authority of Bangladesh

1994~1995

4,000,000,000

26,243,170

Airport-1

Move from

AP-36

2.              

Engineering Services (Stage 2) of ChittagongAirport Development Project

Civil Aviation Authority of Bangladesh, Ministry of Civil Aviation & Tourism

1997~2003

5,409,900,000

106,243,170

Airport-2

Move from

AP-50

3.              

Development of Cox’s BazarAirport (Phase 1)

Civil Aviation Authority of Bangladesh

2010~2012
2014~2018

5,380,000,000

52,722,283

Airport-3

Move from

AP-87

4.              

Consultancy Services for the Project “Construction of 2nd  Runway and other Infrastructure Development Works” at HazratShahjalal International Airport (HSIA), Kurmitola, Dhaka

Civil Aviation Authority of Bangladesh, Ministry of Civil Aviation and Tourism, GoB

2014~2015

120,000,000,000

57,447,388

Airport-4

Move from

AP-101

5.              

Preparation of Master Plan and Feasibility Study of ChittagongInternationalAirport

Japan International Cooperation Agency

1988~1989

2,200,000,000

2,200,000

Airport-5

Move from

MP-8

6.              

R.C.C. Overhead Water Tank (80 Cu. Metre) at DhakaInternationalAirport

Civil Aviation Authority of Bangladesh, Ministry of Civil Aviation & Tourism

1976

3,800,000

38,000

Airport-6

Move from

WS-4

7.              

Planning and Design of Drainage System of Sylhet Airport including necessary Survey Work

Civil Aviation Authority of Bangladesh, Ministry of Civil Aviation & Tourism

1981

6,200,000

165,000

Airport-7

Move from

WS-5

8.              

Consultancy Services for the Development of Cox’s Bazar Airport (Phase-1) Package-II

Civil Aviation Authority of Bangladesh

2016~2017

 

 

 

Agreement available.  PDS draft

9.              

Design and Construction Supervision Services for HazratShahjalal International Airport Expansion Project

Civil Aviation Authority of Bangladesh

2017~2022

N/A

 

 

Agreement available.  PDS draft

10.            

Lungi Airport

 

 

 

 

Airport-9

 

 

Sl. #

Name of the Project

Client

Location

Estimated Cost (Tk.)

1.

Construction of Elevated Expressway at Chittagong from Lalkhan Bazar to Shah Amanat Airport

 

Chittagong

235,831,938.80 (DDC)

353,747,908.20 (Others)

589,579,847.00 (Total)